Skip to content

GERC · Gujarat Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024 — Statement of Reasons

STATEMENT OF REASONS ON GUJARAT ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATIONS, 2024

Statement of reasonsDated 5 Aug 2024

The commission's reasons for the Gujarat Multi-Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 36 of 114. Check the regulator's original before you rely on it.

This Statement of Reasons (SOR), dated 5 August 2024 (p1), explains how GERC finalised the Gujarat Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 after consulting on the Draft GERC MYT Regulations, 2023. It records the position of the earlier GERC MYT Regulations, 2016, which had been extended several times, and the proposed five-year control period from 1 April 2025 to 31 March 2030 (p8). The draft and explanatory memorandum were published on 4 September 2023; 16 stakeholders responded by 6 October 2023 (p8–9).

Chapter 1 introduces the SOR and its method: clause-wise stakeholder comments and the Commission's analysis and decisions, with some comments grouped and some suo-motu changes (p8–9). Chapter 2 covers definitions, including accounting statement, change in law, cut-off date, charges, trial run and distribution system user (p10–14). Chapter 3 sets general principles — annual truing-up versus mid-term review, carrying cost, regulatory accounts, separate petitions for multiple-licence areas, controllable and uncontrollable factors, gain/loss sharing, filing procedure and subsidy (p15–25). Chapter 4 begins financial principles: capital cost, capex plan approval, in-principle approval limits, non-DPR capitalisation, under-recovery in SEZs/SIRs/ports, initial spares, scheme disapproval, capex approval timelines and additional capitalisation (p26–36). The table of contents shows later chapters on Generation (p62), Intra-state Transmission (p84), SLDC (p89), Distribution wires and retail supply (p91), and Annexure-I (p114).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

9 more documents belong here and are not on Voltaic: 8 procedures or orders made under it not held as English text and 1 copy in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document