Gujarat Multi-Year Tariff Regulations, 2024

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2024

RegulationDated 6 Aug 2024Published in the Gazette 6 Aug 2024Notification No. 12 of 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 33 of 207. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's principal multi-year tariff regulation for the five-year Control Period from 1 April 2025 to 31 March 2030, notified as Notification No. 12 of 2024 and published in the Gujarat Government Gazette Extraordinary on 6 August 2024 (p1, p9). It replaces the GERC (Multi-Year Tariff) Regulations, 2016 and their amendments (p9), and it applies to all existing and future generating companies supplying power under section 62 of the Electricity Act, transmission licensees, distribution licensees and the SLDC, for determination of Aggregate Revenue Requirement, tariff and SLDC fees and charges (p9).

The document opens with the gazette cover, a full Table of Contents (pp2-5) and a list of abbreviations (pp6-7), then the notification preamble citing the Electricity Act 2003 and the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003 (p8). Chapter 1 (pp9-29) is preliminary: it sets the short title, extent to the whole State, applicability and commencement, then a very long definitions regulation (p9-25) that fixes the vocabulary for the whole code — COD, availability, declared capacity, controllable/uncontrollable concepts, useful life, transmission capacity rights, and so on. Regulations 3 to 15 set the scope of tariff determination, establish that the norms of operation are ceiling norms, allow a generating company and beneficiaries to agree a lower tariff, and preserve the Commission's powers of relaxation, interpretation, amendment, removal of difficulties, practice directions and inquiry (pp26-29).

Chapter 2 (General Principles) begins at p30. Regulation 16 is the heart of the supplied extract: it establishes the Multi-Year Tariff framework, the filing of forecasts for the whole Control Period, the Commission's year-by-year determination, the Mid-Term Review due by 30 November of the third year, annual truing-up by distribution licensees by 30 November each year, and how gains and losses on controllable and uncontrollable factors are to be attributed and carried (pp30-33). The remaining chapters and annexures are visible only as the Table of Contents: generation, intra-state transmission, SLDC, distribution wires, retail supply, plus Annexures I-V (capital investment planning, allocation of assets between wires and supply, standard cost sheets, etc.) (pp2-5).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Commencement notices and reasons

9 more documents belong here and are not on Voltaic: 8 procedures or orders made under it not held as English text and 1 copy in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document