Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2025

RegulationDated 18 Sep 2025Notification No. TNERC/GEOA/25-1/2025 dated 18-09-2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's principal regulation for Green Energy Open Access (GEOA) in Tamil Nadu, notified as Notification No. TNERC/GEOA/25-1/2025 dated 18-09-2025 (p1). It creates a self-contained route for open access by eligible consumers and RE generators over the intra-state transmission and distribution systems, with a separate set of charges, banking rules, curtailment priority and grievance arrangements. It comes into force on the date of notification in the Tamil Nadu Government Gazette (p1).

Regulations 1–5 set the title, extent, objective, definitions and scope. Scope is limited to electricity from green energy sources (as defined, including hydro, pumped storage, and storage using renewables) and non-fossil-fuel waste-to-energy, on the intra-state system, including intra-state systems incidental to interstate transmission (pp3–4). Eligibility is defined: all EHT and HT consumers with contracted demand of 63 kVA and above, plus traders, distribution licensees and RE generators; captive generating plants get open access rights under s.9 (p6). Everything not specified here — eligibility conditions, outstanding-dues rules, categorisation detail — is carried over from the 2014 Grid Connectivity and Intra-State Open Access Regulations (p4).

Regulations 6–12 cover the machinery: applications through the Central Nodal Agency portal with a direct-to-SNA option, SLDC as State Nodal Agency for short-term and STU for medium- and long-term, distribution licensee consent as a precondition, allotment priority (distribution licensee first, GEOA over ordinary open access, long- over medium- over short-term), duration bands for the three categories, and treatment of existing open access customers (pp4–6).

Regulations 13–19 set the commercial and technical mechanics: 15-minute block energy accounting, banking with drawal netting, lists of applicable charges, banking facility and charges in kind, encashment of unutilised banked energy, curtailment priority, metering to CEA standards, and real-time communication requirements with escalating SLDC sanctions for non-compliance (pp6–10).

Regulations 20–29 mandate a detailed SLDC procedure and a public information page, require compliance with the Grid and Supply Codes, route inter-state transactions to CERC regulations, set dispute resolution and appeal to the Commission, and grant the Commission powers to direct, relax, amend, remove difficulties and to repeal the 2014 Regulations to the extent they covered green energy open access, with savings (pp10–13). The Explanatory Statement (pp14–15) gives the Ministry of Power Rules 2022 and Forum of Regulators model as the source, explains the 63 kVA state threshold and the intra-state-only concessions.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document