TNERC · Tamil Nadu Electricity Regulatory Commission
Terms and Conditions for Green Energy Open Access Regulations, 2024 — Draft
Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024
Draft regulationDated 13 Jun 2024TNERC/GEOA/ ……… dated 13-06-2024
Draft
A proposal that has since been finalised as the Terms and Conditions for Green Energy Open Access Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Draft for consultation. TNERC issued this draft on 13 June 2024, inviting comments by 5 July 2024, and will take it up after thirty days from publication on its website (p1). It would create a dedicated green energy open access regime for the intra-State transmission and distribution systems, displacing the corresponding provisions of the 2014 grid-connectivity regulations to the extent of inconsistency (p12–13), and would come into force on Gazette notification (p1).
Framing (regs 1–4, p1–3). Short title, statewide extent and commencement; an objective of non-discriminatory open access for renewable energy; definitions — notably green energy (wind, solar, hybrid, hydro including pumped storage and small hydro, storage using renewable energy, green hydrogen/ammonia, non-fossil waste-to-energy) and the green energy open access consumer as an EHT/HT consumer with contracted demand of 63 kVA and above (p2); and interpretation rules under which these regulations prevail over inconsistent Commission instruments.
Access architecture (regs 5–12, p3–6). Scope; a split nodal agency, with SLDC handling short-term and STU medium- and long-term access, applications filed on the Central Nodal Agency portal and routed to the State Nodal Agency, with a direct State portal route; capacity criteria for accommodating requests; interface metering; protection of existing RE open access agreements while additional capacity is treated as a fresh application; an allotment priority ladder favouring distribution licensees, then green over ordinary open access, then longer duration, decided first-come-first-served; the duration bands for long-, medium- and short-term access; and eligibility for consumers, licensees, generating companies and captive plants.
Operations and money (regs 13–18, p6–10). 15-minute time-block energy accounting with surplus treated as banked energy; the schedule of charges (transmission, wheeling, cross-subsidy and additional surcharge, banking, standby, reactive energy, SLDC/scheduling/deviation fees) with concessions confined to intra-State transactions; monthly banking with charges rendered in kind, encashment of unutilised banked energy and a carve-out for older wind generators; curtailment priority; metering standards.
Process and residue (regs 19–29, p10–13). SLDC to issue a detailed procedure within 90 days for the Commission's separate approval; a public information and reporting system; communication facilities; grid code compliance; treatment of inter-State transactions; dispute resolution with appeal to the Commission; powers to direct, relax, amend and remove difficulties; savings for the 2014 regulations.
Explanatory statement (p14–15). Links the draft to the national 500 GW/net-zero target, the Ministry of Power's Green Energy Open Access Rules, 2022 and the FOR model regulations, and records the Commission's reasons for the 63 kVA threshold, for restricting concessions to intra-State transactions, and for time-block accounting after DSM implementation.
Read with this
The regulation
- Dated 18 Sep 2025Terms and Conditions for Green Energy Open Access Regulations, 2025
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.