Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Renewable Purchase Obligation and REC Framework Implementation Regulations, 2016

Chiattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2016

RegulationDated 1 Dec 2016No. 75/CSERC/2016 dated lst December 2016

Replaced by Renewable Purchase Obligation and REC Framework Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Chhattisgarh State Electricity Regulatory Commission notifies its Renewable Purchase Obligation and REC framework Implementation Regulations, 2016, issued at Raipur on 1 December 2016 under s.86(1)(e) read with s.181 of the Electricity Act 2003, to give effect to the National Electricity Policy and Tariff Policy direction that State Commissions fix a minimum renewable purchase percentage (p1–2).

Regulation 1 gives the title, extends the Regulations to the whole State and brings them into force from 1 April 2016 — retrospective to the notification date. Regulation 2 sets out the vocabulary the rest depends on: obligated entity, existing and new RE projects, certificate, floor and forbearance price, quantum of purchase, renewable energy sources, small hydel plant and State Agency (p2–3).

Regulation 3 identifies who is obligated — distribution licensees, and captive users and open access consumers of 1 MW and above — with an exemption to the extent of fossil-fuel based cogeneration consumption, and fixes the operating period of FY 2016-17 to FY 2020-21 with a continuation clause (p3–4). Regulation 4 sets out how each class of obligated entity computes total consumption, the year-wise solar, non-solar and total minimum percentages in Table 1, the tariff basis for compliant purchases, and the ways an obligation may be met (p4–5).

Regulation 5 makes CERC-issued RECs the compliance instrument and requires certificate purchases to be filed with the State Agency. Regulation 6 designates CREDA as State Agency for accreditation, recommending projects for registration, and quarterly monitoring and reporting; Regulation 7 governs distribution licensees' estimation in tariff petitions, monthly reporting and carry-forward of excess (p5–6). Regulation 8 applies the same discipline to captive users and open access consumers (p7), and Regulation 9 provides for a separate fund on shortfall valued at the forbearance price, with limited carry-forward where renewable power or RECs are genuinely unavailable (p7).

Regulations 10 to 12 give renewable generators priority grid connectivity, lay down the choice between preferential tariff under the 2012 RE Tariff Regulations and the REC mechanism (including pooled cost of power purchase pricing), and give the Commission power to remove difficulties (p7–8).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Open access

Read with this

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document