Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Renewable Purchase Obligation and REC Framework Regulations, 2021

Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2021

RegulationDated 29 Oct 2021No. 91/CSERC/2021 dated 29th October 2021

1 amendment to it is on Voltaic, dated 20 Dec 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's principal renewable purchase obligation regulation — the instrument that decides who must buy renewable power in Chhattisgarh, how much, and what happens if they don't. It was notified at Raipur on 29 October 2021 as No. 91/CSERC/2021, printed in Hindi on p1 with the English text from p2, and made under s.86(1)(e) read with s.181 of the Electricity Act 2003 (p2).

The recitals anchor it to the Tariff Policy 2016, the national 175 GW RE target and the state's solar-consumption goal (p2). Regulation 1 gives the title, extends it to the whole State and brings it into force from 1 April 2021 — retrospective commencement (p2). Regulation 2 (pp2–4) defines the scheme's vocabulary, from Obligated Entity and Quantum of Purchase to HPO, large and small hydro, existing and new RE projects, and CERC floor and forbearance prices.

Regulation 3 (p4) is the scope clause: distribution licensees, captive users and open access consumers of 1 MW and above, with the consumption basis for each, an exemption where consumption comes from fossil-fuel based cogeneration, and the rule that failed captive end users remain obligated on the power they draw. It also fixes the operating period.

Regulation 4 (pp4–6) is the operative core: how total consumption is computed for each class of obligated entity, which purchases count towards RPO (biomass only under long-term PPAs), the annual minimum percentages in Table 1 split into solar, hydro purchase obligation and non-solar, a "whichever is higher" floor against the MoP/MNRE trajectory for the later years, legacy treatment for captive plants commissioned before 1 April 2016 and for capacity augmentation, continuity of existing long-term RE PPAs, carry-over of surplus against backlog, the menu of compliance options including RECs, and s.142 consequences.

Regulations 5 to 8 (pp6–8) build the machinery: CERC-issued RECs as valid instruments with solar/non-solar matching and 15-day production to the State Agency; CREDA as State Agency with accreditation, data compilation and quarterly public reporting; distribution licensee duties on forecasting in tariff petitions, monthly reporting and surplus carry-forward; and captive/open access consumer duties on monthly reporting and carry-forward to the next financial year. Regulation 9 (p8) sets the default consequences — a ring-fenced fund sized on the shortfall and CERC forbearance price, possibly used by the State Agency to buy RECs, with carry-forward only on a showing of genuine difficulty. Regulation 10 (p8) gives all RE generators priority grid connectivity regardless of capacity. Regulation 11 (pp8–9) covers pricing: a choice between the CSERC RE tariff regulations and the REC mechanism, a three-year REC lock-out after premature PPA termination, the pooled-cost electricity component and exchange-discovered REC price, and cross-subsidy surcharge for open access buyers. Regulations 12 and 13 (p9) give the Commission powers to remove difficulties and to relax any provision by order.

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Open access

Read with this

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document