Banking of Power from Fossil Fuel and Renewable Energy based Captive Generating Plant Regulations, 2017 — Consultative Paper — Draft

CONSULTATIVE PAPER FOR MAKING Bihar Electricity Regulatory Commission (Banking of Power from Fossil Fuel and Renewable Energy based Captive Generating Plant) Regulations, 2017

Draft regulationDated 22 Nov 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a BERC consultative paper, with a full draft regulation attached, proposing a banking framework for power from fossil-fuel and renewable-energy captive generating plants in Bihar (pp3-5). The consultative paper explains that existing solar banking under the BERC renewable tariff regulations is too narrow, so the Commission proposes a broader mechanism: a captive plant may inject surplus power into the grid without selling it and later draw back equivalent power during deficit, emergency, maintenance or shutdown (p3). It records that clause 33 of the BERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2017 will stand repealed after the new regulations are published in the Official Gazette (p4). It invites public and stakeholder comments and objections by 12.12.2017, with the matter to be heard the same day (p4).

The appended draft (pp5-13) contains the proposed regulation. It sets title, Bihar-wide extent and commencement on Gazette notification (p6); defines banking, captive generating plant, metering and settlement terms (pp6-8); and applies the regime to distribution licensees and eligible captive fossil-fuel or renewable plants that interconnect and operate in parallel with the grid (p8). General principles require non-discriminatory banking, day-ahead scheduling, same-year withdrawal, no withdrawal during peak hours, monthly settlement, year-end deemed sale of unused banked power and banking charges differentiated between fossil-fuel and renewable plants (pp8-9). Capacity provisions set a minimum eligibility threshold of 'one MW or MWp' and tie the cumulative facility to the connected transformer's rated capacity (pp9-10). Later chapters cover interconnection and safety, rooftop solar backup wiring, metering with bidirectional ABT-compliant meters and check meters, commercial settlement and billing, RPO treatment, REC eligibility, penalty, and the Commission's powers to direct, relax and amend (pp10-13).

Standard name
Energy Banking
Primary topics
Energy banking, Metering, Technical standards

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document