Skip to content

BERC · Bihar Electricity Regulatory Commission

Banking of Power from Fossil Fuel and Renewable Energy based Captive Generating Plant Regulations, 2018

Banking of Power from fossil fuel and renewable energy based Captive Generating Plant Regulations, 2018

RegulationDated 2 Apr 2018Published in the Gazette 3 Apr 2018No. BERC/SMP-34/2017-04 dated 2nd April 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission issued these regulations under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 to create a banking-of-power facility for captive generating plants in Bihar (p1). They were notified on 2 April 2018, published in the Bihar Gazette (Extraordinary) on 3 April 2018, and come into force from the date of gazette notification (p1).

Regulations 1–2 give the short title, extent to the whole State of Bihar, commencement, and the defined terms (p1–3). Regulation 3 confines the regime to fossil-fuel and renewable-energy based captive plants that interconnect and operate in parallel with the grid, and to the distribution licensee (p3). Regulation 4 sets the substantive bargain: the licensee must offer banking on a non-discriminatory basis covering the agreed surplus energy, injection and drawal are day-ahead scheduled (renewable plants temporarily exempt but bound by SLDC instructions), banked energy is settled month to month and cannot be carried past the financial year, banking charges apply at different rates to fossil and renewable plants with none on unutilized power, the licensee must publish banking guidelines and procedures within three months, and renewable captive plants get non-discriminatory open access at distant consumption units free of transmission/wheeling charges (p3–4).

Regulation 5 sets capacity rules — a minimum eligible plant size, an upper bound tied to captive status under the Electricity Rules, 2005, a cumulative ceiling linked to the connected power transformer's rated capacity — and requires one service line for injection and drawal (p4). Regulations 6–7 cover grid interconnection to CEA standards (including rooftop solar with or without battery backup, anti-islanding and disconnection rights) and metering: bi-directional ABT-compliant special energy meters, mandatory check meters, testing, sealing and reading by the licensee at the generator's cost (p4–5).

Regulation 8 gives the commercial settlement mechanics — carry-forward of injection credits, invoicing of net drawal at the tariff order's average cost of supply, payment for year-end unutilized banked power at average power purchase cost, and dispute resolution by mutual consent falling back to the Commission (p6). Regulations 9–10 align banking with RPO and the CERC REC framework: renewable captive generation counts towards the licensee's RPO (solar and non-solar separately) while fossil-fuel generation does not (p6–7). Regulations 11–14 cover penalty by reference to the Act and the Commission's powers to direct, relax and amend (p7).

Standard name
Energy Banking
Primary topics
Energy banking, Captive status, Open access

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document