TERC · Tripura Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2025

Tripura Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025

RegulationDated 18 Dec 2025Published in the Gazette 22 Dec 2025No.F.24/TERC/2025/1271 dated 18th December 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tripura Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025 — notification No. F.24/TERC/2025/1271 dated 18 December 2025, gazetted on 22 December 2025 — apply across Tripura to distribution licensees, generating companies, the State Transmission Utility, the State Load Despatch Centre, open access customers and other grid-connected entities (p1–2). They set up an end-to-end resource adequacy (RA) framework: demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance (p4).

Chapter 3 places responsibility on the distribution licensee for demand and energy forecasting over short-, medium- and long-term horizons, prescribing permissible forecasting methodologies, use of load research and scientific tools, sensitivity and at least three scenario forecasts, loss trajectories, and the data it must pass to STU and SLDC (p5–8). STU and SLDC aggregate licensee forecasts into state-level demand and energy forecasts and onward to the Commission, Authority, NLDC and RLDC (p8).

Chapter 4 governs generation resource planning: mapping contracted, upcoming and retiring resources with machine-level technical characteristics, computing capacity credit factors (net-load based for RE, availability-based for hydro, coal availability and forced outages for thermal, top-net-load-hours for storage), assessing the planning reserve margin against reliability indices, and deriving the resource adequacy requirement and the resource gap (p8–12). Licensees must hold at least 70% of RAR through long-term contracts and 20% through medium-term contracts, with the balance short-term and day-ahead/real-time market purchases excluded from RAR (p12).

Chapter 5 covers procurement: least-cost optimisation of the resource mix, RE procurement under the 2009 RPO Regulations, storage contracting (BESS/PSP), permitted procurement routes and platforms, regional optimisation of tenure, capacity sharing, and prior Commission approval of PPAs and PSAs (p12–16). Chapter 6 establishes monitoring and a phased non-compliance charge for RA shortfalls (p16–17).

Chapter 7 fixes the annual calendar of submissions and approvals and requires a resource adequacy planning cell and a round-the-clock procurement cell (p17–19). Chapter 8 supplies directions, deviation, relaxation, interpretation, amendment, difficulty-removal and savings provisions (p19–20).

Standard name
Resource Adequacy Framework

Read with this

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document