TERC · Tripura Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2025 — Draft
Tripura Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025
Draft regulationDated 30 Oct 2025No.F.24/TERC/2025/980 dated October 30th, 2025
Draft
A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft Tripura Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025, dated 30 October 2025 and extending to the whole State of Tripura (p1). It is to commence on notification in the Official Gazette; the Gazette date is not printed (p1). The framework plans generation and transmission resources to meet projected demand reliably with an optimum generation mix, including renewable energy and storage (p1–2).
Chapter 1 sets the short title, extent, commencement, objective, scope and definitions (p1–4). Chapter 2 describes the RA process in four steps — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — and defines long-, medium- and short-term planning horizons. It requires the distribution licensee to prepare long-, medium- and short-term distribution resource adequacy plans and requires the distribution licensee, STU and SLDC to give the Commission data and demand forecasts up to ten years ahead (p4–5).
Chapter 3 covers demand assessment and forecasting: long- and medium-term forecast requirements, permitted methods, load research, scenario analysis, loss treatment, and short-term hourly or sub-hourly forecasts. SLDC aggregates distribution forecasts into state-level forecasts and submits them to the Commission, Authority, NLDC and RLDC (p5–8).
Chapter 4 covers generation resource planning: mapping existing, upcoming and retiring resources and their parameters; a net-load-based capacity-credit methodology; planning reserve margin against reliability indices; and calculation and allocation of each distribution licensee's resource adequacy requirement using state and national peak shares. It sets a minimum long-term/medium-term contract mix and excludes day-ahead and real-time market purchases from meeting the requirement (p8–12).
Chapter 5 covers procurement planning: least-cost optimisation, RE and storage procurement, procurement routes and tenure, regional optimisation, capacity sharing, prior Commission approval for PPAs/PSAs, and limited exemptions for emergency and short-term variations (p12–16). Chapter 6 sets the monitoring and compliance cycle and a year-wise non-compliance charge for shortfalls, which cannot be recovered through the ARR (p16–17). Chapter 7 sets data-sharing duties, annual timelines, website disclosure and dedicated planning and real-time procurement cells (p17–19). Chapter 8 contains directions, deviation, relaxation, interpretation, amendment, difficulty-removal and savings provisions (p19–20).
Read with this
The regulation
- Dated 18 Dec 2025Framework for Resource Adequacy Regulations, 2025
Earlier drafts
- Dated 1 Nov 2025Explanatory memorandum: Draft Framework for Resource Adequacy Regulations, 2025 — Explanatory Memorandum
Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.