NERC · Nagaland Electricity Regulatory Commission
Generation Tariff for Renewable Energy Regulations, 2011
Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011
RegulationDated 30 Aug 2011No. NERC/REGN/2011 dated Dated Kohima, the 30th Aug., 2011
1 amendment to it is on Voltaic, dated 4 Oct 2016.
Summary
Summary written by software, from pages 1 to 54 of 63. Check the regulator's original before you rely on it.
The Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011, notified as No. NERC/REGN/2011 on 30 August 2011, is Nagaland's principal framework for fixing generation tariffs for renewable energy (RE) and non-fossil-fuel cogeneration projects selling to distribution licensees in the state (pp1, 4). It is made under Sections 61 and 86 read with Section 181 of the Electricity Act, 2003, and extends to the whole State of Nagaland (p4). It comes into force on publication in the Nagaland Official Gazette; the Gazette date is not printed (p4).
Chapter 1 (pp4–10) contains definitions and scope. It defines RE sources, projects, useful life, inter-connection point, banking, existing and new RE projects, and confirms that tariffs are determined under Section 62 for RE generation sold to distribution licensees. Stand-alone solar PV/thermal projects supplying notified rural areas are excluded from tariff determination (pp12–13). Chapter 2 (pp11–17) sets eligibility criteria for each technology, requires new technologies to be approved by the Commission based on MNRE approval, and imposes obligations on RE generators: DPR submission, data reporting to the Commission and SLDC, grid discipline, protection equipment, compliance with IEGC and State Grid Code, and renewal of existing PPAs for the station's life. It allows sale of power to distribution licensees, local rural grids, open access consumers or third parties, requires the distribution licensee to sign a PPA within two months of offer, and provides non-discriminatory open access on transmission and distribution systems subject to charges and loss adjustment (pp11–17).
Chapter 3 (pp18–22) establishes a three-financial-year control period beginning on notification and stated to run to end-FY 2014–15, with tariff periods varying by technology, and allows project-specific tariffs on a case-to-case basis. It specifies petition requirements, tariff structure, levelisation design, and despatch principles: most RE plants are 'must run', while larger biomass and cogeneration plants are scheduled (pp18–22). Chapter 4 (pp23–28) lays down financial principles: capital cost, debt-equity ratio, interest on loan, depreciation, return on equity, working capital, O&M expenses, rebate, late payment surcharge, sharing of CDM benefits, treatment of subsidies and incentives, and taxes and duties (pp23–28).
Chapters 5 to 10 (pp29–53) contain technology-specific parameters for wind, small hydro, biomass, non-fossil-fuel cogeneration, solar PV and solar thermal. Each chapter specifies capital cost and its indexation, capacity utilisation factor or plant load factor, auxiliary consumption, station heat rate where applicable, O&M expenses, and fuel-related norms for biomass and cogeneration. Chapter 9 also provides for a higher tariff for rooftop and small solar projects (pp45–50). Chapter 11 (p54 onward) grants the Commission powers to relax, amend and remove difficulties.
Read with this
Amendments and corrections
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.