Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a four-page notification in which the Nagaland Electricity Regulatory Commission rewrites six provisions of its 2011 renewable-energy generation tariff regulations (p1). Clauses 1 to 4 deal with financial parameters: the normative interest rate is tied to the average long-term prime lending rate of SBI for the previous year plus a fixed margin (Reg 17(2)); annual depreciation moves to a differential depreciation approach using the straight-line method over loan tenure and beyond (Reg 18(1)(C)); return on equity is specified pre-tax for two distinct periods, higher after the tenth year (Reg 19(2)); and interest on working capital is linked to SBI's average short-term PLR plus a margin (Reg 20(3)) (p1).
Clauses 5 and 6 govern solar PV cost norms. Regulation 60 is rewritten to fix a benchmark capital cost norm for solar PV projects, itemised across land (with a stated land requirement per MW tied to JNNSM project-selection guidelines), civil and general works, PV modules, mounting structures, power conditioning units, evacuation to the interconnection point, and preliminary and pre-operative expenses, summarised in a table on p3 (p1–3). Most heads are justified as fixed percentage hikes over CERC rates or over NERC's own 2011 rates, reflecting Nagaland-specific building-material, equipment and transport costs (p2–3). Regulation 62 is rewritten to specify O&M expenses for solar PV for the first year of operation, escalated annually in line with CERC's guideline, noting the lack of MW-scale solar operating experience in India (p4). The notification is signed by the Secretary by order of the Commission (p4).
Read with this
The regulation
- Dated 30 Aug 2011Generation Tariff for Renewable Energy Regulations, 2011
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.