NERC · Nagaland Electricity Regulatory Commission

Determination of Generation Tariff for Renewable Energy Regulations, 2011 — First Amendment, 2016

NERC (Determination of Generation Tariff for Renewable Energy) (First Amendment) Regulations, 2016

AmendmentDated 4 Oct 2016No. NERC/REGN/2016 dated 04th Oct., '16

Amends the Generation Tariff for Renewable Energy Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a four-page notification in which the Nagaland Electricity Regulatory Commission rewrites six provisions of its 2011 renewable-energy generation tariff regulations (p1). Clauses 1 to 4 deal with financial parameters: the normative interest rate is tied to the average long-term prime lending rate of SBI for the previous year plus a fixed margin (Reg 17(2)); annual depreciation moves to a differential depreciation approach using the straight-line method over loan tenure and beyond (Reg 18(1)(C)); return on equity is specified pre-tax for two distinct periods, higher after the tenth year (Reg 19(2)); and interest on working capital is linked to SBI's average short-term PLR plus a margin (Reg 20(3)) (p1).

Clauses 5 and 6 govern solar PV cost norms. Regulation 60 is rewritten to fix a benchmark capital cost norm for solar PV projects, itemised across land (with a stated land requirement per MW tied to JNNSM project-selection guidelines), civil and general works, PV modules, mounting structures, power conditioning units, evacuation to the interconnection point, and preliminary and pre-operative expenses, summarised in a table on p3 (p1–3). Most heads are justified as fixed percentage hikes over CERC rates or over NERC's own 2011 rates, reflecting Nagaland-specific building-material, equipment and transport costs (p2–3). Regulation 62 is rewritten to specify O&M expenses for solar PV for the first year of operation, escalated annually in line with CERC's guideline, noting the lack of MW-scale solar operating experience in India (p4). The notification is signed by the Secretary by order of the Commission (p4).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Return, financing and working capital, Capital cost and investment

Read with this

The regulation

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document