Skip to content

KERC · Karnataka Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2024 — Draft

Karnataka Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024

Draft regulationDated 14 May 2024KERC/F-30/Vol-10/132 dated 14.05.2024

Draft

A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification from the Karnataka Electricity Regulatory Commission (KERC), dated 14 May 2024, inviting stakeholder comments on the Draft KERC (Framework for Resource Adequacy) Regulations, 2024 (p1–2). It sets out a proposed state-level resource adequacy framework to ensure enough generation capacity is tied up to meet forecast demand reliably and at least cost (p2–3, p5). The Commission states it is acting under the Electricity Act 2003 and following the Electricity (Amendment) Rules 2022, the CEA Guidelines for Resource Adequacy Planning Framework for India (28 June 2023) and the Forum of Regulators model regulations (June 2023) (p1–2).

Chapter 1 gives the short title, extent to Karnataka, commencement on Gazette notification, objective, scope and definitions of resource adequacy terms, planning horizons and contract durations (p2–5). Chapter 2 outlines the framework steps: demand assessment and forecasting, generation resource planning, power procurement planning, and monitoring and compliance, and assigns LT-DRAP preparation to distribution licensees and ST-DRAP to SLDC (p5–6).

Chapter 3 requires distribution licensees to forecast demand and energy by consumer category using specified methodologies and scenarios, and for SLDC to aggregate state-level forecasts and submit them to CEA, NLDC and SRLDC (p6–8). Chapter 4 covers generation resource planning: data inputs, optimization constraints, capacity crediting for renewable, storage, hydro and thermal resources, calculation of resource adequacy requirement and allocation of national peak contribution, determination of LOLP/NENS and optimal planning reserve margin, and the annual LT-DRAP process (p9–20). Chapter 5 deals with procurement planning, least-cost resource mix, advance procurement lead times, PPA approval and emergency procurement exceptions (p20–23). Chapter 6 sets monitoring and compliance, including SLDC monthly reporting and treatment of shortfalls (p23–24). Chapter 7 covers data sharing, website publication, dedicated planning and power exchange cells, and an annual implementation timeline (p24–26). Chapter 8 provides miscellaneous powers for inspection, directions, relaxation, amendment and removal of difficulties (p26–27). The regulations would come into force from Gazette notification; the Gazette date is not printed (p2).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs

Read with this

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document