KERC · Karnataka Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2024
Karnataka Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024
RegulationDated 23 Sep 2024KERC/F-30/Vol-10/690 dated 23.09.2024
Summary
Summary written by software, from pages 1 to 26 of 27. Check the regulator's original before you rely on it.
KERC's Framework for Resource Adequacy Regulations, 2024 is a principal state regulation issued by notification dated 23.09.2024. It extends to the whole of Karnataka and comes into force from the date of its notification in the Official Gazette. The preamble (pp1–2) records that it follows the Ministry of Power's Electricity (Amendment) Rules, 2022, the CEA's Guidelines for Resource Adequacy Planning Framework for India of 28 June 2023, and the Forum of Regulators model regulations. It was finalised after a draft gazette notification on 14 May 2024, newspaper publication, and a public hearing on 21 August 2024.
Chapter 1 (pp2–5) sets title, extent, commencement, objective, scope and definitions. It applies to generating companies, distribution licensees, SLDC, STU, transmission licensees and other grid-connected entities in Karnataka. It defines long-term (10 years), medium-term (1–5 years) and short-term (1 day–1 year) procurement, capacity credit, EENS, LOLP, NENS, net load, PRM, RAR and related terms. Clause 4.3 makes these regulations override similar provisions in other KERC regulations.
Chapter 2 (p5) establishes the RA framework as four steps: demand assessment and forecasting, generation resource planning, power procurement planning, and monitoring and compliance. The distribution licensee prepares the LT-DRAP and SLDC prepares the ST-DRAP.
Chapter 3 (pp5–8) specifies demand assessment and forecasting. The distribution licensee must forecast hourly or sub-hourly demand for each tariff category using methods such as CAGR, end-use, trend analysis, ARIMA and AI/ML, taking into account DSM, open access, DER, demand response, EVs, tariff signals, solarisation, net metering and policy influences. It must develop at least most-probable, business-as-usual and aggressive scenarios and submit the best scenario to SLDC by 30 April. SLDC aggregates state-level forecasts by 31 May.
Chapter 4 (pp8–20) is the core. It lays down generation resource planning methodology, data inputs, optimisation constraints, capacity crediting and firm-capacity calculation, RAR allocation, and determination of LOLP/NENS and optimal PRM. It specifies top net load hours for renewable capacity credit, with ELCC to be adopted later; treatment of hydro and thermal capacity credit; and the annual process from SLDC's 31 May submission through LT-NRAP/ST-NRAP publication by 31 July, LT-DRAP submission to CEA by 30 September and to the Commission by 30 November, Commission approval by 31 December, contracting details to SLDC by 31 January, and regional/national aggregation in February, with a national auction for shortfall in March.
Chapter 5 (pp20–23) covers power procurement planning: least-cost resource mix, RE/RPO procurement, storage contracting, procurement through central agencies, traders, exchanges, banking and capacity sharing, and advance procurement lead times by technology and tenure. Clauses 16–17 require prior Commission approval for new PPAs/PSAs and allow additional short-term procurement in specified contingencies without prior approval, with reporting within 15 days.
Chapter 6 (p23) sets monitoring and compliance, including SLDC monthly compliance reporting and non-compliance charges for shortfall in RA and operating reserve. Chapter 7 (pp24–26) covers data sharing, website publication, dedicated Planning Cell and Power Exchange Cell, and the annual implementation timeline. Chapter 8 (p26) gives the Commission powers to inspect models, issue directions, relax provisions, amend regulations and remove difficulties.
Read with this
Earlier drafts
- Dated 14 May 2024Framework for Resource Adequacy Regulations, 2024 — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.