APERC · Andhra Pradesh Electricity Regulatory Commission

Framework for Resource Adequacy Regulation, 2026 — Draft

Andhra Pradesh Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026.

Draft regulationDated 6 Mar 2026

Draft

A proposal that has since been finalised as the Framework for Resource Adequacy, 2026 — Regulation 04.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft principal regulation from the Andhra Pradesh Electricity Regulatory Commission, proposed under s.181 read with ss.61, 66 and 86 of the Electricity Act 2003, that would install a resource adequacy regime for the state (p1-2). It is signed at Kurnool on 06.03.2026 and would commence on publication in the AP Official Gazette (p2, p25). It binds DISCOMs, generating companies, the SLDC, APTRANSCO as STU and other grid-connected entities, and overrides inconsistent earlier APERC regulations including the 2000 load-forecast and resource-plan guidelines (p2).

Clauses 1-5 state title, extent, commencement, objectives, scope and definitions, and describe the RA framework as an annual, rolling ten-year exercise in six stages: demand assessment and forecasting, generation resource planning, transmission and distribution network planning, procurement planning, and monitoring and compliance. DISCOMs are to prepare long-, medium- and short-term distribution resource adequacy plans (LT/MT/ST-DRAP), while the STU files transmission planning criteria with its MYT/annual tariff petitions (p2, p5).

Clauses 6-12 are the analytical core: how DISCOMs build long/medium-term and short-term demand forecasts at consumer-category and hourly or sub-hourly granularity, how the SLDC aggregates state demand and files it with CEA/NLDC/RLDC, what generation planning inputs are required, a net-load method for capacity credit of RE, hydro, thermal and storage resources, treatment of the planning reserve margin, and how the discom-wise RA requirement, resource gap and share of the national peak are computed and allocated (pp6-16). Clauses 13-18 cover procurement: optimal resource mix and least-cost modelling, contract tenure, preference for in-region resources, storage contracting, capacity sharing, and prior Commission approval for new PPAs/PSAs, with a narrow carve-out for exigent procurement (pp16-19).

Clauses 19-21 set monitoring, non-compliance charges and incentives, a data-sharing protocol among DISCOMs, SLDC, STU, CEA, RLDC and NLDC, and a detailed annual calendar running from April data submission to Commission approval of the RA plan and completion of contracting by March (pp19-23). Clauses 22-31 require cybersecurity and grid-resilience plans, website publication of procurement and merit-order data, dedicated planning and trading cells, and give the Commission powers of practice direction, relaxation, amendment and savings (pp23-25). Annexure-I prescribes the modelling methodology and planning constraints; Annexure-II supplies fourteen reporting formats (pp26-47).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Network planning and investment

Read with this

The regulation

Commencement notices and reasons

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗