Framework for Resource Adequacy Regulation, 2026 — Draft
Andhra Pradesh Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026.
Draft regulationDated 6 Mar 2026
Draft
A proposal that has since been finalised as the Framework for Resource Adequacy, 2026 — Regulation 04.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft principal regulation from the Andhra Pradesh Electricity Regulatory Commission, proposed under s.181 read with ss.61, 66 and 86 of the Electricity Act 2003, that would install a resource adequacy regime for the state (p1-2). It is signed at Kurnool on 06.03.2026 and would commence on publication in the AP Official Gazette (p2, p25). It binds DISCOMs, generating companies, the SLDC, APTRANSCO as STU and other grid-connected entities, and overrides inconsistent earlier APERC regulations including the 2000 load-forecast and resource-plan guidelines (p2).
Clauses 1-5 state title, extent, commencement, objectives, scope and definitions, and describe the RA framework as an annual, rolling ten-year exercise in six stages: demand assessment and forecasting, generation resource planning, transmission and distribution network planning, procurement planning, and monitoring and compliance. DISCOMs are to prepare long-, medium- and short-term distribution resource adequacy plans (LT/MT/ST-DRAP), while the STU files transmission planning criteria with its MYT/annual tariff petitions (p2, p5).
Clauses 6-12 are the analytical core: how DISCOMs build long/medium-term and short-term demand forecasts at consumer-category and hourly or sub-hourly granularity, how the SLDC aggregates state demand and files it with CEA/NLDC/RLDC, what generation planning inputs are required, a net-load method for capacity credit of RE, hydro, thermal and storage resources, treatment of the planning reserve margin, and how the discom-wise RA requirement, resource gap and share of the national peak are computed and allocated (pp6-16). Clauses 13-18 cover procurement: optimal resource mix and least-cost modelling, contract tenure, preference for in-region resources, storage contracting, capacity sharing, and prior Commission approval for new PPAs/PSAs, with a narrow carve-out for exigent procurement (pp16-19).
Clauses 19-21 set monitoring, non-compliance charges and incentives, a data-sharing protocol among DISCOMs, SLDC, STU, CEA, RLDC and NLDC, and a detailed annual calendar running from April data submission to Commission approval of the RA plan and completion of contracting by March (pp19-23). Clauses 22-31 require cybersecurity and grid-resilience plans, website publication of procurement and merit-order data, dedicated planning and trading cells, and give the Commission powers of practice direction, relaxation, amendment and savings (pp23-25). Annexure-I prescribes the modelling methodology and planning constraints; Annexure-II supplies fourteen reporting formats (pp26-47).
Read with this
The regulation
- Dated 26 May 2026Framework for Resource Adequacy, 2026 — Regulation 04
Commencement notices and reasons
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.