Standards of Performance for Distribution Licensees Regulations, 2014

Rajasthan Electricity Regulatory Commission (Standards of Performance for Distribution Licensees) Regulations, 2014

RegulationDated 17 Feb 2014In force from 1 Oct 2014No. RERC/ Secy / Regulation 103 dated 17th February, 2014

Replaced by Standards of Performance for Distribution Licensees Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been done for the purpose of meeting SOP obligation shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is RERC's principal regulation setting the service standards that every distribution licensee (including deemed licensees) in Rajasthan must meet for its consumers, notified on 17 February 2014 and brought into force on 1 October 2014 (p1). It was made under the consumer-protection provisions of the Electricity Act, 2003 — ss.57–59 read with ss.86(1)(i) and 181 (p1).

Regulations 1–3 (p1) give the title, commencement and scope, and define the working vocabulary the rest of the instrument depends on: area of supply, call-centre, Class-1 cities, EHT/HT/LT voltage bands, rural and urban areas, and 'licensee'. Regulation 4 (p2) creates the two-tier structure of obligations: 'Guaranteed' standards whose breach triggers monetary compensation, to be read with the RERC Supply Code Regulations, 2004. Regulations 5 and 6 (pp2–3) build the complaint machinery — a published bilingual complaints manual, call centres with toll-free numbers rolled out on staged deadlines, complaint registration and status-update duties, and the route for claiming compensation from the Assistant Engineer, with escalation to the CGRF and the Electricity Ombudsman, and additional compensation for late payment. Regulation 7 (p3) introduces 'Overall' standards measured against annual targets and allows compensation paid to be recovered through the ARR depending on performance. Regulations 8 and 9 (p4) require half-yearly SOP reports in formats SOP-1 to SOP-5 and half-yearly publication of performance. Regulation 10 (p4) suspends the standards during force majeure, strike, upstream outages and agency shutdowns. Regulations 11–15 (pp4–5) preserve consumer rights under other laws, repeal the 2003 SOP Regulations with a saving for burnt-meter cost/security and for past action, and give the Commission powers to remove difficulties, amend and relax.

The schedules carry the substance: Schedule-1 (pp6–8) sets guaranteed restoration, quality, metering, shifting, connection, transfer, billing and disconnection timelines by city class and voltage; Schedule-2 (pp9–10) sets the compensation payable per item and the delay multiplier; Schedule-3 (pp11–12) defines the overall standards including the SAIFI and SAIDI reliability indices; Schedule-4 (pp13–14) fixes the minimum annual achievement percentages, leaving reliability index values to be notified separately. The annexures (pp15–21) are the reporting formats and the model complaint-registration format.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, New connections and load changes

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document