The Meghalaya State Electricity Regulatory Commission issued these regulations on 22 October 2018 under sections 61, 66, 86(1)(e) and 181 of the Electricity Act 2003 to create and enforce a renewable purchase obligation (RPO) regime for the State (p1). They apply throughout Meghalaya, come into force on publication in the Meghalaya Official Gazette — the Gazette date is not printed — and the RPO framework is stated to run until 31 March 2021 (p1, p3).
Regulations 1–4 fix the title, definitions, coverage and operating period. Regulation 2 supplies the vocabulary the rest of the instrument turns on: obligated entity, captive user and captive generating plant, eligible entity, certificate, floor and forbearance price, State Agency and Verifying Agency (p1–3). Regulation 3 brings distribution licensees, captive users and open access consumers within the State into scope, and Regulation 5 makes that reach precise — captive plants of 5 MW and above used for self-consumption, and open access consumers with contract demand of at least 1 MVA buying fossil-fuel-based power, each liable only to the extent of consumption met from that source, with renewable-based captive plants and standby/emergency plants excluded (p3–4).
Regulation 5 is the operative core: it prescribes a rising minimum RPO percentage split into solar and non-solar components across the three target years (p4); it excludes hydro consumption from the RPO denominator; it applies the target to a distribution licensee's energy input grossed up for T&D losses but to actual drawal-point consumption for other obligated entities; and it preserves RE power purchase agreements already consented by the Commission even where they exceed the target (p4–5). It also requires mandatory registration and reporting through an RPO Compliance and Monitoring Web Tool, with annual estimates due by 15 March (p5, p7).
Regulations 6–7 deal with how compliance is discharged: grid-connected rooftop solar counts towards solar RPO for both obligated and non-obligated entities, subject to metering conditions (p5–6), and renewable energy certificates issued under the CERC framework are the tradable instruments, with solar certificates meeting the solar obligation and non-solar certificates the rest (p6).
Regulations 8–11 set up the machinery and the consequences of failure: State Agency functions vested in MNREDA, including procedures, accreditation, certificate accounts and building the compliance web tool within three months (p7–8); verifying agencies — the State Load Despatch Centre for licensees and open access consumers, the Chief Electrical Inspector for captive producers (p3, p8–9); and default consequences comprising a deposit into an RPO Fund at the forbearance price, penalty under section 142 that cannot be passed through in a distribution licensee's ARR, and possible carry-forward of the shortfall (p9).
Regulations 12–19 address renewable generators themselves: priority open access and connectivity (p10), accreditation eligibility, grant, five-year validity, monitoring, revocation, fees, website disclosures and compliance auditors (p10–14). Regulations 20–24 reserve to the Commission dispute redressal, direction, relaxation, review and amendment powers, and savings for unusual matters (p14–15).
Read with this
Amendments and corrections
2 more documents belong here and are not on Voltaic: 2 amendments.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.