Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Renewable Energy Purchase Obligation & its Compliance (2nd Amendment) Regulations, 2018

Meghalaya State Electricity Regulatory Commission (Renewable Energy Purchase Obligation & its Compliance) (2nd Amendment) Regulations, 2018

AmendmentDated 30 Aug 2022Published in the Gazette 30 Aug 2022No.MSERC/RPO/Regulations/2018/02 dated The 30th August, 2022

Amends the Renewable Energy Purchase Obligation & its Compliance Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-paragraph Gazette notification by which the Meghalaya State Electricity Regulatory Commission amends clause 5.2 of its 2018 Renewable Energy Purchase Obligation (RPO) and Compliance Regulations (p1). It is short, self-contained and operative only on the one clause it rewrites.

Paragraph 1 gives the short title, provides that the amendment comes into force from the date of publication in the Meghalaya Official Gazette and remains operative until revised, and extends it to the whole State of Meghalaya (p1).

Paragraph 2 substitutes the text of clause 5.2, which obliges every obligated entity to buy a defined minimum percentage of its electricity from renewable sources, measured in kWh, over a year (p1). The substituted clause carries a financial-year-wise table running from FY 2018-19 to FY 2023-24, split into solar, non-solar and total minimum purchase percentages (p2).

The rest of paragraph 2 sets out how the base is measured and what offsets apply: RPO applies to an obligated entity's total consumption excluding hydro-sourced power; for a distribution licensee the target applies to energy input (energy sales grossed up for transmission and distribution losses), while for other obligated entities it applies to actual consumption recorded at the drawal or consumption point excluding power supplied by a distribution licensee; the obligation is inclusive of renewable purchases already being made; renewable-power PPAs already signed by distribution licensees and consented to by the Commission continue for their existing validity even if they exceed the specified percentages; and captive users may set off power from waste-heat recovery against their non-solar RPO where that generation and consumption exceeds their RPO target (p2).

One thing to note: although styled a 2018 amendment, it was notified in 2022 and the trajectory it prescribes starts retrospectively at FY 2018-19.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

2 more documents belong here and are not on Voltaic: 2 amendments.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document