PSERC · Punjab State Electricity Regulatory Commission
Deviation Settlement Mechanism and related matters Regulations, 2025 — Order approving with modifications
Punjab State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2025
OrderDated 2 Dec 2025
Made under the Deviation Settlement Mechanism and related matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
PSERC's order dated 2 December 2025 approves the Punjab State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2025 with modifications (p1, p28). It disposes stakeholder objections to the draft regulations issued for comments by public notice on 27 September 2025, after a public hearing on 29 October 2025 and SLDC/PSTCL comments dated 18 November 2025 (p1). It is a clause-by-clause record of draft provisions, objections from NPL Rajpura, TSPL, CE/SLDC PSTCL and CE/PP&R PSPCL, SLDC comments, and the Commission's analysis and decisions (pp1–28).
On Regulation 1, the Commission deletes a proviso concerning wind and solar generators to avoid misreading applicability (pp1–2). On Regulation 2, it aligns definitions with CERC DSM Regulations 2024, including Area Clearing Price and Reference Charge Rate (pp2–3). Regulation 4 defines who is covered: sellers and buyers using intra-state transmission/distribution, including open access, captive and renewable generators, with a threshold for general sellers (5 MW and above, subject to separate staged revision) and exclusions for wind/solar governed by PSERC F&S Regulations 2019 and certain captive/hydro categories (pp3–9). The Commission rejects PSPCL's request to be treated as one composite entity for DSM and does not exempt state-owned hydro; run-of-river hydro instead gets liberal volume limits (pp6–9).
Regulation 5 requires state entities to inform SLDC of contracts, follow the State Grid Code and IEGC 2023, and comply with SLDC despatch instructions, with SLDC publishing relevant information (pp9–10). Regulation 6 sets the DSM design parameters: scheduling period, scheduling/despatch principles, deviation, settlement period, measurement unit and loss allocation (pp10–12). Regulation 11 specifies category-wise and frequency-linked charges for deviation for sellers and buyers, approves volume limits, aligns them with CERC DSM 2024 and state-specific conditions, and directs SLDC to report monthly on the State DSM pool account (pp12–19). Regulations 12–14 cover the State Energy Account, weekly accounting and the State Deviation Pool Account, and payment timelines/Letter of Credit for defaulting entities (pp19–26).
Additional comments on schedule revisions, ancillary reserves and a stabilisation period are answered, and the Commission directs commercial operation from 1 April 2026 after trial operation through SAMSAT since 15 March 2025 (pp26–27). Finally, it directs PSTCL to strengthen SLDC staffing, autonomy, infrastructure and ring-fenced funding, and approves the regulations with modifications (pp27–28).
Read with this
The regulation
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.