Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2025

RegulationDated 2 Dec 2025Published in the Gazette 4 Dec 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Punjab State Electricity Regulatory Commission's principal 2025 regulation for the intra-state deviation settlement mechanism (DSM), notified on 2 December 2025, gazetted on 4 December 2025, and coming into force on 1 April 2026 across Punjab (p1). It replaces the PSERC DSM Regulations, 2020 from commencement, with savings for past actions (pp17–18).

Regulations 1–4 set the title, commencement, definitions and objective, and define applicability: sellers and buyers using intra-state open access through InSTS/distribution systems, with separate treatment for wind/solar generators, partial open-access consumers, distribution-connected consumers and captive standby power (pp1–6). Regulations 5–8 impose duties on state entities and SLDC, lay out the DSM design parameters (scheduling period, despatch principles, deviation, settlement period, measurement units, loss allocation), cross-refer scheduling to the Grid Code and Open Access Regulations, and create a gaming-enquiry power (pp6–8).

Regulations 9–11 are the computational core: deviation formulas for general sellers and buyers, the normal-rate formula based on power-exchange ACPs and ancillary service charges, and detailed frequency-linked charge tables for general sellers, RoR hydro, municipal-solid-waste stations, standalone energy storage and buyers, including volume limits, infirm power, start-up power, forced outage and HP-DAM treatment (pp9–13). Regulations 12–14 establish the State Energy Account, weekly State Deviation Pool Account, payment timelines, delay interest, letters of credit and default consequences (pp13–16). Regulations 15–20 provide governance through SGCRC/CMC and a possible Punjab State Power Committee, and give the Commission powers to amend, relax, remove difficulties and issue practice directions (pp16–18).

Standard name
DSM Regulations

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document