State Grid Code Regulations, 2025

Arunachal Pradesh State Electricity Regulatory Commission (State Grid Code) Regulations, 2025

CodeDated 31 Oct 2025Published in the Gazette 6 Nov 2025No. APSERC/NOTIFICATION/53/2025 dated The 31st October, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software, from pages 1 to 17 of 68. Check the regulator's original before you rely on it.

The Arunachal Pradesh State Electricity Regulatory Commission issued the State Grid Code Regulations, 2025 by notification dated 31 October 2025, published in the Arunachal Pradesh Gazette on 6 November 2025 (p1). They repeal the earlier APSERC (State Grid Code) Regulations, 2018, extend to the whole State and come into force on Gazette publication; they are to be consistent with the CERC Indian Electricity Grid Code, 2023, with IEGC prevailing for inter-State inconsistencies (p1, p3).

Chapter 1 sets the general framework: objective, scope, compliance obligations on STU and Users, confidentiality, dispute settlement before the Commission, communication protocols, and directives from the appropriate Government; it also lists the Code's fifteen chapters (p1–3).

Chapter 2 is a substantial definitions chapter running to 114 definitions, covering technical, commercial, grid-state, metering, open-access and institutional terms (p3–8).

Chapter 3 deals with Code management and institutional roles. It lists applicable CEA and CERC regulations (p8); assigns functions to SLDC, STU, transmission licensees, distribution licensees and generating companies (p8–10); creates a State Grid Code Review Committee with specified composition and functions; and sets out review and amendment procedure, including periodic review and Commission approval (p10–11).

Chapter 4 is the system planning code: resource adequacy, integrated resource planning, demand forecasting, transmission resource adequacy, planning criteria, planning responsibilities and data submissions, with annual planning cycles (p12–14). Chapter 5 covers connection conditions: minimum technical/design/operational criteria, application and rejection procedure, connection agreements, Site Responsibility Schedule, access to sites, system performance and connection points (p15–17).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Connectivity and GNA

Read with this

Earlier drafts

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document