APSERC · Arunachal Pradesh State Electricity Regulatory Commission
State Grid Code Regulations, 2025
Arunachal Pradesh State Electricity Regulatory Commission (State Grid Code) Regulations, 2025
CodeDated 31 Oct 2025Published in the Gazette 6 Nov 2025No. APSERC/NOTIFICATION/53/2025 dated The 31st October, 2025
Summary
Summary written by software, from pages 1 to 17 of 68. Check the regulator's original before you rely on it.
The Arunachal Pradesh State Electricity Regulatory Commission issued the State Grid Code Regulations, 2025 by notification dated 31 October 2025, published in the Arunachal Pradesh Gazette on 6 November 2025 (p1). They repeal the earlier APSERC (State Grid Code) Regulations, 2018, extend to the whole State and come into force on Gazette publication; they are to be consistent with the CERC Indian Electricity Grid Code, 2023, with IEGC prevailing for inter-State inconsistencies (p1, p3).
Chapter 1 sets the general framework: objective, scope, compliance obligations on STU and Users, confidentiality, dispute settlement before the Commission, communication protocols, and directives from the appropriate Government; it also lists the Code's fifteen chapters (p1–3).
Chapter 2 is a substantial definitions chapter running to 114 definitions, covering technical, commercial, grid-state, metering, open-access and institutional terms (p3–8).
Chapter 3 deals with Code management and institutional roles. It lists applicable CEA and CERC regulations (p8); assigns functions to SLDC, STU, transmission licensees, distribution licensees and generating companies (p8–10); creates a State Grid Code Review Committee with specified composition and functions; and sets out review and amendment procedure, including periodic review and Commission approval (p10–11).
Chapter 4 is the system planning code: resource adequacy, integrated resource planning, demand forecasting, transmission resource adequacy, planning criteria, planning responsibilities and data submissions, with annual planning cycles (p12–14). Chapter 5 covers connection conditions: minimum technical/design/operational criteria, application and rejection procedure, connection agreements, Site Responsibility Schedule, access to sites, system performance and connection points (p15–17).
Read with this
Earlier drafts
- Dated 7 Aug 2025Arunachal Pradesh State Grid Code Regulations, 2025 — Draft
- Dated 7 Aug 2025Public notice: State Grid Code Regulations, 2025 — Public Notice — Draft
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.