APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Arunachal Pradesh State Grid Code Regulations, 2025 — Draft
Arunachal Pradesh State Electricity Regulatory Commission (State Grid Code) Regulations, 2025
Draft regulationDated 7 Aug 2025No. APSERC/Notification________/2025
Draft
A proposal that has since been finalised as the State Grid Code Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Arunachal Pradesh State Electricity Regulatory Commission (State Grid Code) Regulations, 2025, issued by APSERC as a notification to replace the 2018 State Grid Code. It is made under section 181 read with section 86(1)(h) of the Electricity Act 2003 and extends to the whole State. It comes into force from the date of publication in the Official Gazette, though the Gazette date is not printed, and the notification date is blank (p1). The Code aligns the State Transmission System with the IEGC 2023 and the National Electricity Policy, and says IEGC prevails if a State provision is inconsistent on inter-State transmission (p1, p3).
Chapter 1 sets general rules: scope, structure, implementation by STU, Grid Code Review Committee, confidentiality, dispute settlement, communication and government directives (p1–3). Chapter 2 is the definition chapter covering over 100 terms, from Active Power and ABT to User and Time Block (p4–11). Chapter 3 defines the management framework and roles of SLDC, STU, transmission licensees, distribution licensees and generating companies, and creates the State Grid Code Review Committee with representation, meeting, review and amendment procedures (p12–16).
Chapter 4 covers system planning: integrated resource planning, demand forecasting, generation and transmission resource adequacy, planning criteria and contingencies, planning data and the annual transmission system plan (p17–21). Chapter 5 sets connection conditions: minimum technical, design and operational criteria, application and processing procedure, rejection, connection agreement, site responsibility schedule, interface points, reactive power, harmonics, communication, recording instruments, cyber security and RE connectivity (p22–27). Chapter 6 deals with system security: synchronised operation, switching and isolation rules, important elements, AVR/PSS tuning, islanding, UFR/df/dt load shedding, voltage limits, defence mechanisms, frequency management and curtailment protocols for frequency and transmission congestion (p28–34).
Chapter 7 covers operational planning: demand estimation, demand management, load shedding and load-crash response and data requirements (p35–37). Chapter 8 specifies commissioning and commercial operation date, including start-up power, infirm power, trial-run data, and COD declaration for hydro, transmission and RE generating stations (p38–43). Chapter 9 sets inter-user boundary safety, designated officers, permits to work, line clear permits, safety manuals and standards (p44–46). Chapter 10 is the scheduling and dispatch code: responsibility demarcation, day-ahead and intra-day scheduling timelines, revisions, renewable scheduling, technical minimum for thermal stations, reactive power management and commercial settlement (p47–54). Chapter 11 is the outage planning code: annual outage planning, shutdown approval, recovery and restoration procedures (p55–58).
Chapter 12 requires monthly and quarterly reports and sets operational event and accident reporting, including reportable incidents, forms and major failure reporting (p59–60). Chapter 13 is the protection and metering code: protection coordination, fault clearance times, generator, line, transformer and substation protection, testing and calibration, and a detailed metering code on types, standards, ownership, location, accuracy, sealing, testing, failure and quality assurance (p61–70). Chapter 14 covers data registration and miscellaneous matters, including responsibility for data, changes, methods, unsupplied data, dispute redressal, non-compliance, derogation and powers to remove difficulties, relax and amend (p71–72). Formats for line clear permits and appendices A–G for standard and detailed planning data, operational planning data, protection data, metering data, site responsibility schedule and incident reporting follow (p73–90).
Read with this
The regulation
- Dated 31 Oct 2025State Grid Code Regulations, 2025
Earlier drafts
- Dated 7 Aug 2025Public notice: State Grid Code Regulations, 2025 — Public Notice — Draft
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.