Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Electricity Supply Code (Second Amendment) Regulations, 2024

JSERC (Electricity Supply Code) (Second Amendment) Regulations, 2024

AmendmentDated 15 Mar 2024Published in the Gazette 15 Mar 2024In force from 1 Apr 202497 dated 15 th March, 2024

Amends the Jharkhand Electricity Supply Code, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment by the Jharkhand State Electricity Regulatory Commission (JSERC) to its Electricity Supply Code Regulations, 2015. It was published in the Jharkhand Gazette Extraordinary on 15 March 2024 (p1) as Notification No. 97, extends to the State of Jharkhand, and comes into force on 1 April 2024 unless reviewed earlier or extended by the Commission (p2).

The Commission states the amendment follows Ministry of Power notifications published in the Gazette of India — G.S.R. 818(E) dated 31 December 2020 and G.S.R. 125(E) dated 22 February 2024 — and the Electricity (Rights of Consumers) Amendment Rules 2020 (p1).

Three changes are made to the Principal Regulations. First, a new sub-clause 5.2.5 in Chapter A5 (Requisition for Supply) allows connection charges for new connections in electrified areas up to 150 kW to be fixed on the basis of load, category of connection and the licensee's average cost of connection, avoiding site inspection and case-by-case estimation, with demand charges payable at the time of application (p2).

Second, clause 6.26 in Chapter A6 (Procedure for providing fresh electricity connection) is substituted: the licensee must provide or modify a connection within three days in metropolitan areas, seven days in other municipal areas and fifteen days in rural areas, with a further proviso allowing up to thirty days in rural areas, and ninety days where extension of distribution mains or commissioning of a new substation is required (p2).

Third, Chapter A10 (Billing) gains sub-clauses 10.1.1(g) and (h) requiring easy-to-understand bills and bills issued in the local language along with English (p2). It binds distribution licensees in Jharkhand and serves consumers seeking new connections or receiving bills.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Billing and payment

Read with this

The regulation

Amendments and corrections

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document