JSERC · Jharkhand State Electricity Regulatory Commission
Jharkhand Electricity Supply Code, 2015
Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015
RegulationDated 7 Sep 2015Published in the Gazette 9 Sep 201545 dated 07th September 2015
2 amendments to it are on Voltaic, the latest dated 15 Mar 2024.
Summary
Summary written by software, from pages 1 to 26 of 104. Check the regulator's original before you rely on it.
The Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015 (Notification No. 45, dated 7 September 2015, Gazette 9 September 2015) replace the State's 2005 Supply Code and set out how Distribution Licensees in Jharkhand must serve consumers. Made under s.181(2)(x) read with s.50 of the Electricity Act 2003, they bind all Distribution Licensees in their respective licensed areas and come into force three months after Gazette publication (p1–2).
Chapter A1 (pp1–4) fixes title, extent and commencement; creates an Electricity Supply Code Review Panel (ESCRP) chaired by a Commission Chairperson/Member, with licensee, transmission, SLDC and consumer representatives, a quorum of eight and a cap of fifteen members, meeting at least yearly to monitor compliance and review the Code; prescribes how anyone may propose changes, and the Commission's amendment procedure with mandatory licensee and public consultation and newspaper publication; and repeals the 2005 Regulations while saving past actions and proceedings and reserving the Commission's power to correct errors.
Chapter A2 (pp4–5) adopts Electricity Act definitions and defines operative terms such as applicant, application and application form, area of supply, assessing and authorised officers and representatives, billing period, check meter, Class-I cities and agreement.
Chapter A6 (pp20–26) is the operative core: acknowledgement and record-keeping on a first-come-first-served basis; deemed dates of receipt of the application form and application; inspection and re-inspection timelines by category and area; demand-note contents, payment window and lapse; the applicant's option to execute works through licensed contractors; deemed sanction of load where the licensee misses inspection timelines; energization deadlines keyed to network availability, mains extension or a new substation; and a separate temporary-supply procedure, including that no connection up to 10 kW may be rejected on technical grounds.
Read with this
Amendments and corrections
- Dated 8 Nov 2018Electricity Supply Code, 2015 — First Amendment, 2018
- Dated 15 Mar 2024Electricity Supply Code (Second Amendment) Regulations, 2024
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.