DERC · Delhi Electricity Regulatory Commission
Power System Development Fund Regulations, 2019
Delhi Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019
Draft regulationDated 11 Jan 2019F.3(551)/Tariff-Engg./DERC/2018-19/6195 dated 11/01/2019
Draft
A proposal that has since been finalised as the Power System Development Fund Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019 create a dedicated fund — the PSDF — to finance transmission and grid-security works in Delhi, and set out how it is filled, spent, appraised and audited (p1, p2–3). Money accrues from Deviation Settlement Charges left in the State Deviation Pool Account after final settlement, from Reactive Energy Charges, and from any other charges the Commission notifies; agencies collecting these must transfer balances monthly, and Delhi SLDC maintains and operates the fund, including amounts accumulated before these Regulations (p3).
Regulation 4 lists permissible uses: strategically important transmission to relieve intra-state congestion, reactive compensation equipment (shunt capacitors, series compensators, SVC, STATCOM), special protection schemes and protection-audit corrections, renovation and modernisation of the transmission system, and supporting studies, capacity building and PMUs (p3–4). Projects proposed by distribution utilities that are incidental to the intra-state transmission system may be funded, but the Distribution Licensee itself is not eligible for assistance (p4) — a tension within the same regulation. Prioritisation turns on grid security, state importance and national/multi-utility/regional/state ordering (p4).
Governance is split: SLDC is Nodal Agency and secretariat, preparing the Detailed Procedure, budget, accounts and Annual Report (p4); GoNCTD's Department of Power constitutes an Appraisal Committee chaired by the DERC Chairperson with MD (DTL) and ED (SLDC) for techno-economic appraisal and prioritisation (p4–5), and an Inter-Departmental Monitoring Committee chaired by Secretary (Power) for sanction, release and monitoring (p5). Regulation 8 sets the application-to-sanction pipeline, ending with the Commission confirming scope and prioritisation while leaving cost to the tariff-petition stage (p5–6). Assistance is a grant subject to availability and strategic importance (p6–7); entities execute and maintain assets under the DERC Tariff Regulations, 2017 (p7). Later regulations cover budget and audit via the Detailed Procedure, implementing agencies, annual reporting to GoNCTD, DERC and the Legislative Assembly, and the Commission's residual powers of relaxation, interpretation, difficulty removal and amendment (p7–8).
Read with this
The regulation
- Dated 27 Dec 2019Power System Development Fund Regulations, 2019
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.