CSERC · Chhattisgarh State Electricity Regulatory Commission
Renewable Purchase Obligation and REC Framework Implementation Regulations, 2013
Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2013
RegulationDated 18 Sep 2013In force from 1 Apr 2013No. 48/CSERC/2013 dated September 18, 2013
Replaced by Renewable Purchase Obligation and REC Framework Implementation Regulations, 2016
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Chhattisgarh State Electricity Regulatory Commission's principal instrument imposing a renewable purchase obligation (RPO) on obligated entities in the State and adopting the Central Commission's Renewable Energy Certificate (REC) framework as one route to discharge it. It was notified on 18 September 2013 (p1) but comes into force retrospectively from 1 April 2013, and runs for the control period up to 31 March 2016, with the FY 2015-16 obligation continuing thereafter until the Commission revises it (p2, p7).
Regulation 3 defines who is obligated — distribution licensees, captive users with 1 MW and above connected load, and open access consumers of 1 MW and above procuring non-RE power — and Regulation 4 sets out how each category's total consumption is computed, the source-wise minimum percentages (in Table 1) and the permitted ways of meeting the obligation, including own generation, procurement, purchase from another licensee or RECs (p6–10). Regulation 5 makes CERC-issued certificates the valid compliance instrument, with solar and non-solar certificates kept separate (p10–11).
Regulation 6 designates CREDA as State Agency for accreditation, registration recommendation, data collection, quarterly publication and reporting on compliance (p11–13). Regulations 7 and 8 deal with the reporting and carry-forward arrangements specific to distribution licensees and to captive/open access consumers respectively (p13–15). Regulation 9 sets out what happens on default — a Commission-determined fund computed on the shortfall and the CERC forbearance price, which the State Agency may deploy to buy certificates, with carry-forward available on genuine difficulty (p15–16).
Regulations 10 and 11 cover grid connectivity priority for RE generators irrespective of capacity, and RE pricing — the choice between the Commission's 2012 RE tariff regulations and the REC mechanism, the two-component REC price with the electricity component based on pooled cost of power purchase, cross-subsidy surcharge on open access RE sales and the absence of banking (p16–18). Regulation 12 is the usual power to remove difficulties (p19). The RPO percentages are only recoverable from the worked illustration at p13.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.