Summary
Summary written by software, from pages 1 to 30 of 102. Check the regulator's original before you rely on it.
The KSERC (Renewable Energy and Related Matters) Regulations, 2025 are a five-year, State-wide framework for grid-interactive renewable energy — generation, storage, prosumer metering, connectivity and related obligations — notified by the Kerala State Electricity Regulatory Commission under the Electricity Act, 2003 (p1–2). The notification is No. 3228/Con.Engg/2023/KSERC dated 5 November 2025, carried in the Kerala Gazette Extraordinary No. 3944 of 6 November 2025 (p1). The regulations take effect on gazette publication, but commencement is staged: the energy accounting, billing and settlement provisions of Chapter III apply only from 1 January 2026, and Virtual Power Plant, peer-to-peer and vehicle-to-grid provisions (Regulations 21–23) start only after a distribution licensee pilot study and a notified procedure (p2). A transitional proviso treats consumers who already hold feasibility/registration and complete installation in time as existing prosumers (p2).
Chapter I (pp2–17) is the general part. It fixes the short title, extent, commencement and control period (p2); sets the scope — RE systems including storage, consumers and prosumers, captive consumers and CPPs, IPPs and distribution licensees, and other obligated entities, across tariff determination, RPO compliance, metering and billing, prosumer connectivity, CPP accounting, storage/banking/open access, capacity enhancement and other injection–withdrawal methods (p2–3); preserves existing net-metering prosumers until they opt out, plant life expires or capacity is enhanced (p3); carries the definitional code of 103 terms (p3–15); lays down interpretation rules (p15–16); and creates a standing monitoring and review mandate over the energy transition, including periodic impact analysis, policy advisories to the State Government, annual review of licensees' Resource Adequacy plans and a possible review of the regulations after two years (p16–17). Chapter V is cross-referenced for capital cost (p5).
Chapter II (pp18–30) deals with grid-interactive RE systems generally. Its Part A sets prosumer eligibility (Regulations 6–13): capacity bands by consumer category for net metering with hybrid-inverter/storage conditions attached to higher capacities, net billing, gross metering, behind-the-meter systems (prior intimation, no export, reverse-power relay), virtual net metering (eligible categories, lead person, plant and share limits), group net metering, the treatment of DRE plants above 1000 kW, and the charging/discharging criteria for prosumer storage (p18–22). Part B (Regulations 14–23) covers connectivity: technical standards and safety keyed to CEA regulations, the grid code and IEEE/IEC standards; metering infrastructure and meter classes by capacity; hosting capacity limits at feeder, transformer and phase level with a defined overshoot allowance; and the application–feasibility–registration pipeline with statutory timelines, fees (Table 1, p29), deemed feasibility for small PM Surya Ghar rooftop systems, registration validity, extension, surrender and forfeiture, testing, connectivity agreement and connection timelines (Table 2, p30) (p22–30).
Read with this
The regulation
- Dated 5 Nov 2025Renewable Energy and Related Matters Regulations, 2025
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.