Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Renewable Energy and Related Matters Regulations, 2025

Kerala State Electricity Regulatory Commission (Renewable Energy and Related Matters) Regulations, 2025

RegulationDated 5 Nov 2025No. 3228/ Con.Engg/ 2023/ KSERC dated 5 th November, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software, from pages 1 to 31 of 106. Check the regulator's original before you rely on it.

The KSERC notification of 5 November 2025 makes the Kerala State Electricity Regulatory Commission (Renewable Energy and Related Matters) Regulations, 2025 under s.181(1) of the Electricity Act 2003 read with ss.61, 62, 66 and s.86(1)(a), (b) and (e) (p1). They extend to the whole of Kerala and come into force on the date of Gazette publication. The rules are on a staggered clock: energy accounting, billing and settlement under Chapter III begin on 1 January 2026, and Virtual Power Plant, Peer-to-Peer and Vehicle-to-Grid (Regulations 21–23) start only after a distribution-licensee pilot and a notified detailed procedure (p1–2). The control period is five years from FY 2025–26 (p2). Existing prosumers with prior feasibility who install within the specified timelines are treated as existing prosumers (p1).

Chapter I (pp1–17) sets title, commencement, scope, interpretation and 103 definitions, then directs the Commission to monitor and review the State's energy transition — annual review of licensees' Resource Adequacy plans, periodic impact analysis, policy advisories, stakeholder awareness on smart appliances, possible review of the regulations after two years, and possible grid-contribution charges so non-participating consumers are not burdened by prosumer incentives (pp16–17).

Chapter II Part A (pp18–23) specifies which consumer categories may opt for each metering arrangement and the capacity bands and storage conditions attached: Net Metering, Net Billing, Gross Metering, Behind-the-Meter, Virtual Net Metering, Group Net Metering, the treatment of DRE plants above 1000 kW, and operating criteria for prosumer storage (charge in solar hours, discharge in peak hours, normally).

Chapter II Part B (pp23–31) specifies technical standards and safety duties by reference to CEA, CERC and IEEE/IEC standards; metering infrastructure classes and who installs and maintains meters; hosting-capacity limits at feeder, distribution-transformer and phase level, including the over-hosted-capacity allowance; and the application, feasibility, registration and connectivity procedure with fees, deemed feasibility, validity, forfeiture and connection timelines.

The contents list and cross-references show Chapters III (energy accounting, billing and settlement), V (capital cost) and Regulations 21–23, along with several annexures, sit beyond the supplied pages.

Standard name
Net Metering and Rooftop Solar, RPO Regulations, Renewable Energy Tariff Regulations, Energy Storage, Open Access Regulations
Primary topics
Net metering, Renewable purchase obligation (RPO / RCO), Renewable energy tariff

Read with this

Other copies of these documents (1)

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document