Summary
Summary written by software, from pages 1 to 31 of 106. Check the regulator's original before you rely on it.
The KSERC notification of 5 November 2025 makes the Kerala State Electricity Regulatory Commission (Renewable Energy and Related Matters) Regulations, 2025 under s.181(1) of the Electricity Act 2003 read with ss.61, 62, 66 and s.86(1)(a), (b) and (e) (p1). They extend to the whole of Kerala and come into force on the date of Gazette publication. The rules are on a staggered clock: energy accounting, billing and settlement under Chapter III begin on 1 January 2026, and Virtual Power Plant, Peer-to-Peer and Vehicle-to-Grid (Regulations 21–23) start only after a distribution-licensee pilot and a notified detailed procedure (p1–2). The control period is five years from FY 2025–26 (p2). Existing prosumers with prior feasibility who install within the specified timelines are treated as existing prosumers (p1).
Chapter I (pp1–17) sets title, commencement, scope, interpretation and 103 definitions, then directs the Commission to monitor and review the State's energy transition — annual review of licensees' Resource Adequacy plans, periodic impact analysis, policy advisories, stakeholder awareness on smart appliances, possible review of the regulations after two years, and possible grid-contribution charges so non-participating consumers are not burdened by prosumer incentives (pp16–17).
Chapter II Part A (pp18–23) specifies which consumer categories may opt for each metering arrangement and the capacity bands and storage conditions attached: Net Metering, Net Billing, Gross Metering, Behind-the-Meter, Virtual Net Metering, Group Net Metering, the treatment of DRE plants above 1000 kW, and operating criteria for prosumer storage (charge in solar hours, discharge in peak hours, normally).
Chapter II Part B (pp23–31) specifies technical standards and safety duties by reference to CEA, CERC and IEEE/IEC standards; metering infrastructure classes and who installs and maintains meters; hosting-capacity limits at feeder, distribution-transformer and phase level, including the over-hosted-capacity allowance; and the application, feasibility, registration and connectivity procedure with fees, deemed feasibility, validity, forfeiture and connection timelines.
The contents list and cross-references show Chapters III (energy accounting, billing and settlement), V (capital cost) and Regulations 21–23, along with several annexures, sit beyond the supplied pages.
Read with this
Other copies of these documents (1)
- Dated 5 Nov 2025Renewable Energy and Related Matters Regulations, 2025
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.