Summary written by software. Check the regulator's original before you rely on it.
This is the PSERC's disposal order on the draft Punjab State Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2019, issued at Chandigarh on 09.09.2020 (p1, p25). It records stakeholder comments on the draft, the Commission's analysis and the modifications it adopts, then approves the regulations as the PSERC (Deviation Settlement Mechanism and related matters) Regulations, 2020 with those modifications (p25).
The order is structured as a regulation-by-regulation record. Section 2 addresses definitions — 'Deviation', 'Full/Partial Open Access Consumer' and 'MoD Guidelines' (p1–3). Section 3 deals with applicability, including the threshold for coverage, the treatment of PSPCL's generation and distribution arms as separate entities, and the decision to amend clause (A) because the draft's exemption of must-run generators departed from CERC regulations (p3–5). Sections 4 and 5 cover SLDC/State Entity duties and the principles for operationalising the mechanism, including merit-order publication, telemetry and the amended clause 6(G) (p5–8).
Sections 6 to 9 address scheduling, gaming, deviation charges and volume limits. The Commission fixes its own cap rate reflecting the variable cost of Punjab IPPs (p9–11), and widens the volume limit from the draft figure to a higher one while adding a minimum limit for buyers (p11–14). Section 9(7) is deleted; Section 9(8) is aligned to CERC treatment of infirm power (p14–16). Section 13 deletes the installed-capacity tolerance provision and retains a MW-based band (p16–18). Later sections dispose of comments on the State Energy Account, accounting of charges, payment security (LC/RBI letter of mandate) and governance (p18–22), and Annexure-II tables are amended to separate buyer and seller bands (p22). The closing pages clarify treatment of run-of-river and small hydro plants and direct staff to begin consequential amendments to the Open Access Regulations and State Grid Code (p23–25).
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.