Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2020

Punjab State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2020

RegulationDated 10 Sep 2020Published in the Gazette 10 Sep 2020No. PSERC/Secy./Regu. 150 dated The 10th September, 2020

Replaced by Deviation Settlement Mechanism and related matters Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Punjab State Electricity Regulatory Commission issued this principal regulation on 10 September 2020 (p1). It creates a state-level Deviation Settlement Mechanism for intra-state grid users, replacing interim reliance on CERC's 2014 DSM framework once its commercial provisions start. It extends to the whole State of Punjab (p1).

Regulations 1–4 cover short title, commencement, definitions and applicability. DSM applies to Sellers above 5 MW, including renewable generators other than wind and solar, open access and captive generators (excluding in-situ captive) connected to InSTS, and to Buyers including distribution licensees, deemed distribution licensees and full open access consumers connected to InSTS (p4). Wind and solar are routed to PSERC's 2019 forecasting, scheduling and deviation regulations; partial open access and distribution-connected consumers are settled under the Open Access Regulations (p1, p4).

Regulations 5–8 specify SLDC and State Entity duties, the design parameters for operationalising DSM — scheduling period, despatch principles, frequency range, deviation definition, settlement period, measurement units, price vector, volume limit and loss allocation — plus scheduling and gaming treatment (p4–8). Regulations 9–11 set charges for deviation, caps, volume limits, additional charges, sustained-deviation sign-change penalties, and treatment of infirm and start-up power (p7–12). Regulations 12–16 require SLDC procedures, State Energy Account, weekly deviation accounts, payment timelines, the State Deviation Pool Account and letter of credit/RBI mandate security (p12–15). Regulations 17–21 establish governance and reserve powers (p15). Annexures I–III reproduce the CERC price-vector table and notes, additional-charge tables for buyers and sellers, and a numeric illustration (p16–20).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document