TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Resource Adequacy Framework Regulations, 2024 — Draft
Tamil Nadu Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024
Draft regulationDated 13 Jun 2024TNERC/RA/ ……… dated 13-06-2024
Draft
A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is TNERC's consultation package for a state resource adequacy framework: an Explanatory Memorandum (EM) on pp1–14, the full text of the draft Tamil Nadu Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024 on pp15–31, and data templates in Annexure-I on pp32–38. It is signed and dated 13-06-2024, and comments are invited up to 05-07-2024 (p15).
The EM is the argument for the framework. The introduction (pp4–5) describes Tamil Nadu's demand growth and RE build-out, places the draft against the MoP amendment rules of December 2022, IEGC 2023, CEA's RA guidelines and the FoR model regulations, and states that the Commission may fold the EM's suggestions into the final text. Section 1 (pp6–7) argues for hourly, model-driven demand forecasting by the distribution licensee with state-level aggregation by STU/SLDC. Section 2 (pp8–12) explains capacity crediting by a net-load method, how a planning reserve margin follows from reliability indices, and how the state's RA requirement is computed and shared out — 100% to the single licensee in Tamil Nadu. Section 3 (pp12–13) covers least-cost procurement mix, contract tenure and capacity trading. Section 4 (p14) sets a compliance calendar and a non-compliance charge formula.
The draft regulations turn this into binding text. Chapter 1 (pp15–17) gives short title, statewide extent, commencement on Gazette publication, objective, scope and definitions. Chapter 2 (p18) lists the six steps of the framework, fixes five-year and one-year horizons, and obliges the licensee to produce MT-DRAP and ST-DRAP. Chapter 3 (pp18–21) prescribes forecasting methodologies, scenario analysis, hourly forecasts and state aggregation with annual deadlines. Chapter 4 (pp21–25) requires a resource map of contracted, upcoming and retiring plant with technical characteristics, a net-load capacity-credit computation, a planning reserve margin tied to LOLP/NENS, and identification and allocation of the resource gap. Chapter 5 (pp26–28) sets procurement rules — least-cost modelling, RPO-linked RE procurement, storage contracting, use of DEEP/PUShP, contract-mix minima, a rolling plan, capacity sharing, prior approval of PPAs, and exemptions for emergency purchases. Chapter 6 (pp28–29) provides for non-compliance charges levied by TNSLDC and barred from ARR recovery. Chapter 7 (pp29–30) sets data-sharing duties, the annual timeline, website publication duties and two dedicated cells. Chapter 8 (pp30–31) is boilerplate on directions, deviation, relaxation, amendment and removal of difficulties. Annexure-I (pp32–38) supplies the data templates.
Read with this
The regulation
- Dated 20 Jun 2025Framework for Resource Adequacy Regulations, 2025
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.