Framework for Resource Adequacy Regulations, 2025

Tamil Nadu Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025

RegulationDated 20 Jun 2025Published in the Gazette 16 Jul 2025Notification No. TNERC/RA/1/2025 dated 20-06-2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 31. Check the regulator's original before you rely on it.

This is the Tamil Nadu Government Gazette, Part VI—Section 2, dated 16 July 2025 (p1), carrying the TNERC (Framework for Resource Adequacy) Regulations, 2025, notified on 20 June 2025. It is a principal state regulation made under section 181 of the Electricity Act 2003 read with sections 61, 66 and 86, extending to the whole of Tamil Nadu and binding generating companies, the distribution licensee (TNPDCL), the State Load Despatch Centre (TNSLDC), the State Transmission Utility (TANTRANSCO) and other grid-connected entities (p2–3).

Chapters 1–2 (p2–4) set out title, extent, commencement, objectives, scope, definitions and the RA framework's six steps — demand assessment and forecasting, generation resource planning, transmission and distribution network planning, procurement planning, and monitoring and compliance — with long, medium and short-term horizons defined.

Chapter 3 (p4–7) governs demand assessment: the distribution licensee must forecast energy and demand within its control area using scientific and statistical methods, category-wise consumption data, loss trajectories, peak-demand derivation, scenario analysis, and short-term hourly or sub-hourly forecasts that TNSLDC aggregates to state level.

Chapter 4 (p7–10) covers generation resource planning: mapping contracted, upcoming and retiring resources with their technical parameters, computing capacity credit factors by a net-load top-hours method, determining planning reserve margin against reliability indices, and deriving the resource adequacy requirement, its allocation among licensees, and the required long/medium/short-term contract mix.

Chapter 5 (p10–12) sets procurement planning: a least-cost optimal resource mix, procurement type and tenure rules, declared transmission corridor information, annual rolling plans, capacity sharing, prior Commission approval of new PPAs and PSAs, and emergency or short-term variations.

Chapter 6 (p12–13) covers monitoring and compliance, including the annual shortfall-reporting cycle, non-compliance charges for RA shortfall levied by TNSLDC, their non-recoverability through ARR, and a standing RA review committee. Chapter 7 (p13–14) lists the data-sharing protocol, annual timelines, website publication duties and dedicated planning and real-time cells; Chapter 8 (p14) provides directions, deviation, relaxation, practice-direction, amendment and difficulty-removal powers. Annexure-I (p15–18) supplies the data templates. A separate Explanatory Memorandum (p19–26) gives the rationale, abbreviations and the four RA building blocks, and states it should be read with the Regulations (p22).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Network planning and investment

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document