Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2024 — Draft

Assam Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) Guidelines, 2024

Draft guidelinesDated 11 Sep 2024AERC. 872/2023/13 dated 11th September, 2024

Draft

A proposal that has since been finalised as the Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission issued this draft notification on 11 September 2024 (p1) to layer a Group Net Metering (GNM) and Virtual Net Metering (VNM) framework on top of its existing Grid Interactive Rooftop Solar PV System Regulations, 2019. Clauses 1–2 give the title and commencement (in force from the date of issue) and define the two arrangements (p1): under GNM a consumer's surplus solar or BESS output is exported through a net meter and set off against more than one service connection of the same consumer; under VNM the entire generation is exported through a renewable energy/gross meter and shared across participating consumers in the ratio agreed in their MoU.

GNM is open to all Assam consumers, while VNM is limited to domestic consumers plus group housing societies, government/local authority offices, hospitals, colleges, schools, charitable and non-profit institutions, and renewable energy generators (p2). Eligibility capacity is tied to the 2019 Regulations, and the DISCOM bears service-line and network augmentation capex, recovered through ARR subject to prudence check, and must file a grid-impact study within four months (p2).

Applications go to the DISCOM with a non-refundable fee, and connectivity follows a three-tier process — feasibility analysis, registration, connection agreement (p3). Connectivity, standards, safety and metering track the 2019 Regulations; the consumer bears the differential cost of the net meter (p3).

Clauses 8 and 9 set the accounting mechanics: time-block matching first, then a consumer-specified priority list for surplus, carry-forward of energy credits within the settlement period, and moderation by ToD rebate/surcharge (p3–5). VNM credits follow the agreed procurement ratio, and a disconnected participant's unadjusted units are paid out at year end (p5). Year-end surplus is settled at APPC (p5). A charge exemption applies only to systems commissioned by 31 March 2024 (p6). Clauses 10–17 also cover the DISCOM agreement format (60 days for approval), RPO and REC treatment, and the Commission's powers to relax, amend and interpret.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Billing and payment, Metering

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document