AERC · Assam Electricity Regulatory Commission
Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2024
AERC Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2024
GuidelinesDated 10 Dec 2024Published in the Gazette 19 Dec 2024No. 745 dated The 10th December, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission creates two shared-generation frameworks on top of the AERC (Grid Interactive Rooftop Solar PV System) Regulations, 2019: Group Net Metering (GNM), where one consumer's surplus export is adjusted across that consumer's own service connections, and Virtual Net Metering (VNM), where energy from a single renewable system is credited across several participating consumers (p1–2). Both definitions expressly allow a Battery Energy Storage System charged from a renewable source.
Clauses 3–4 set scope and network obligations. GNM is open to all consumers; VNM to domestic consumers and specified non-domestic categories — group housing societies, government and local-authority offices, hospitals, colleges, schools, charitable and non-profit institutions — plus renewable energy generators (p2). Individual system size is bounded, and annual generation may be capped by the normative CUF/PLF the Commission sets for each technology. The distribution licensee must augment the network under the Supply Code Regulations 2017, bear service-line and augmentation capex with pass-through in the ARR subject to prudence check, and file a grid-impact technical study within four months (p2–3).
Clauses 5–7 cover process: a three-tier route of feasibility analysis, registration and connection agreement, with a non-refundable application fee; connectivity and safety per the 2019 Regulations; and metering — a remotely readable renewable energy meter at the generation point, CEA Meters Regulations 2006 compliance, and the net/export-import meter cost on the consumer (p3–4).
Clauses 8–10 give billing and energy-accounting rules. Under GNM, export first offsets the host connection and then other connections in a consumer-declared priority order, with time-block matching, carry-forward of energy credits within the settlement period and ToD moderation (p4–5). Under VNM, credits are split by the agreed procurement ratio, changeable once a year, with unadjusted credits paid out on disconnection (p5–6). End-of-year surplus is settled at the APPC rate in the APDCL tariff order.
Clauses 11–17 cover the DISCOM–consumer agreement (format to be filed within 60 days for approval), exemption from wheeling, banking and cross-subsidy charges for systems commissioned up to a stated cut-off date for their useful life, RPO treatment, REC eligibility under the 2019 Regulations, and the Commission's powers to relax, amend and interpret (p6).
Read with this
Earlier drafts
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.