APERC · Andhra Pradesh Electricity Regulatory Commission
Threshold Limit for the Development of Intra-State Transmission (INST) Projects under Tariff Based Competitive Bidding Regulation, 2024
THE ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION (THRESHOLD LIMIT FOR THE DEVELOPMENT OF INTRA-STATE TRANSMISSION (INST) PROJECTS UNDER THE TARIFF BASED COMPETITIVE BIDDING) REGULATION, 2024.
RegulationDated 17 May 2024Published in the Gazette 17 May 2024Regulation No. 5 of 2024 dated 17-05-2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
An Andhra Pradesh Electricity Regulatory Commission regulation notified in the Andhra Pradesh Gazette on 17 May 2024 (p1). Its title says it fixes a threshold limit for the development of intra-state transmission (INST) projects through tariff-based competitive bidding — that is, the cut-off that decides when the bidding route applies to such a project (p1). The notification carries the file reference Lr. No. APERC/Secy/F.No. S-19(Vol-III)/D.No.1036 and the number Regulation No. 5 of 2024 (p1).
Read with this
Procedures and orders made under it
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.