Threshold Limit for Development of Intra-State Transmission Projects under TBCB Regulation, 2024

The Andhra Pradesh Electricity Regulatory Commission (Threshold Limit for the Development of Intra-State Transmission Projects under Tariff Based Competitive Bidding) Regulation 2024

OrderDated 16 May 2024Regulation 5 of 2024 dated 16.05.2024

Made under the Threshold Limit for the Development of Intra-State Transmission (INST) Projects under Tariff Based Competitive Bidding Regulation, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's order of 16 May 2024 disposing of objections to the draft threshold-limit regulation for intra-state transmission and enclosing the final regulation as Annexure-II (p1, p8, p11).

Pages 1–8 are the statement of reasons. The Commission records that the draft was placed on its website with a public notice on 08.09.2023 (p1) and deals clause by clause with the comments received from APTRANSCO, APSEB Engineers' and other employee associations, Prayas Energy Group, AP Textile Mills Association and individuals (p2–6). It changes commencement from 01.04.2024 to the date of Gazette publication (p2), re-dates the definition of "New Intra State Transmission Projects" to the notification date (p3), raises the threshold from the draft Rs 100 crore to above Rs 250 crore excluding land cost (p7–8), and narrows clause 3.2 so the limit applies to all new InST projects still awaiting Commission approval (p8). It declines a public hearing, holding previous publication under the Electricity (Procedure for Previous Publication) Rules, 2005 sufficient (p5–6). Investment-slab tables of APTRANSCO's 5th and 6th control period plans and a comparison of other SERCs' thresholds underpin the Rs 250 crore figure (p6–7).

Annexure-I lists 30 objectors and mass representations (p9–10). Annexure-II is the Regulation itself (p11–15): definitions, the threshold limit and its application, single-project bidding, cost-plus and below-threshold carve-outs, and the Commission's powers to relax, issue directions, remove difficulties and amend.

Primary topics
Competitive bidding, Network planning and investment

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document