This document is the Statement of Objects and Reasons (SOR) for the Uttarakhand Electricity Regulatory Commission (Distribution Code) Regulations, 2018 (p1). It explains why the Commission revised the 2007 Distribution Code, records the consultation on the draft UERC (Distribution Code) Regulations, 2017, and sets out the Commission's decisions on stakeholder comments. It states the final 2018 Regulations, not the SOR, prevail if there is any discrepancy (p2).
The SOR describes the consultation: comments were invited by 20.10.2017, extended to 24.11.2017, and a public hearing was held on 12.12.2017; Annexure-I lists those who commented and Annexure-II lists hearing participants (p1, p23–24). The main body is a clause-by-clause account of comments and Commission views. It records the expansion of applicability from large consumers to consumers (p2), clarifications on definitions including area of supply and interface/connection/boundary point (p3), and the addition of a State Advisory Committee member to the Distribution Code Review Panel (p3–4).
It discusses technical requirements: power system studies to be shared with the STU (p5); retention of two-transformer and alternate-supply requirements for 33/11 kV substations (p5–6); revision of the pole/plinth mounting threshold from 250 KVA to 160 KVA (p7); a proviso setting DT metering timelines for urban and rural areas (p7–8); deletion of random transformer dismantling in quality assurance (p10); an altitude note for BIL/BSL values (p11–12); and retention of IEEE/CEA harmonics references (p12–13). It adds technical audit of one 33/11 kV substation per Electricity Distribution Circle each financial year (p14), revises the interface point for EHT/HT consumers (p14–15), retains mobile breakdown vans and preventive maintenance (p17–18), expands tools/equipment requirements (p18–19), and makes transformer parameters more flexible for single-phase and dry-type units (p19–20). General comments on power quality compensation and smart metering are addressed at pp21–22. The annexures are lists only (p23–24).
Read with this
The regulation
- Dated 31 Mar 2018Uttarakhand Distribution Code, 2018
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.