UERC · Uttarakhand Electricity Regulatory Commission

Distribution Code Regulations, 2018 — Statement of Objects and Reasons

Statement of Objects and Reasons (SOR)

Statement of reasonsDate not stated

The commission's reasons for the Uttarakhand Distribution Code, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is the Statement of Objects and Reasons (SOR) for the Uttarakhand Electricity Regulatory Commission (Distribution Code) Regulations, 2018 (p1). It explains why the Commission revised the 2007 Distribution Code, records the consultation on the draft UERC (Distribution Code) Regulations, 2017, and sets out the Commission's decisions on stakeholder comments. It states the final 2018 Regulations, not the SOR, prevail if there is any discrepancy (p2).

The SOR describes the consultation: comments were invited by 20.10.2017, extended to 24.11.2017, and a public hearing was held on 12.12.2017; Annexure-I lists those who commented and Annexure-II lists hearing participants (p1, p23–24). The main body is a clause-by-clause account of comments and Commission views. It records the expansion of applicability from large consumers to consumers (p2), clarifications on definitions including area of supply and interface/connection/boundary point (p3), and the addition of a State Advisory Committee member to the Distribution Code Review Panel (p3–4).

It discusses technical requirements: power system studies to be shared with the STU (p5); retention of two-transformer and alternate-supply requirements for 33/11 kV substations (p5–6); revision of the pole/plinth mounting threshold from 250 KVA to 160 KVA (p7); a proviso setting DT metering timelines for urban and rural areas (p7–8); deletion of random transformer dismantling in quality assurance (p10); an altitude note for BIL/BSL values (p11–12); and retention of IEEE/CEA harmonics references (p12–13). It adds technical audit of one 33/11 kV substation per Electricity Distribution Circle each financial year (p14), revises the interface point for EHT/HT consumers (p14–15), retains mobile breakdown vans and preventive maintenance (p17–18), expands tools/equipment requirements (p18–19), and makes transformer parameters more flexible for single-phase and dry-type units (p19–20). General comments on power quality compensation and smart metering are addressed at pp21–22. The annexures are lists only (p23–24).

Standard name
Distribution Code
Primary topics
Technical standards, Distribution system planning and operation, Metering

Read with this

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document