Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Uttarakhand Distribution Code, 2018

Uttarakhand Electricity Regulatory Commission (Distribution Code) Regulations, 2018

CodeDated 31 Mar 2018No F-(9)27/RG/UERC/2018/2016 dated March 31, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 21 of 40. Check the regulator's original before you rely on it.

This is UERC's principal Distribution Code, Notification No F-(9)27/RG/UERC/2018/2016 dated 31 March 2018, made under s.181 of the Electricity Act 2003 read with s.86(1)(c), (e) and (i) and clause 18 of the distribution and retail supply licence (p1). It binds every distribution system participant — distribution licensees including deemed licensees, open access customers connected to distribution systems, other distribution licensees, institutions under proviso 8 to s.14, embedded generators and consumers (p1). It takes effect on the date of Gazette publication and replaces the 2007 Distribution Code; the Gazette date is not printed (p1).

Chapter 1 (p1–5) sets the title, applicability, commencement, a definitions list, objectives, scope, implementation duties, limits of the code, confidentiality and a dispute route through the Distribution Code Review Panel to the Commission. Chapter 2 (p5–7) creates the Distribution Code Review Panel (DCRP) as a standing body — its composition across licensees, STU, SLDC, generators, renewable agency and consumer categories, member tenure, secretariat and cost, functions, and the procedure for reviewing and revising the code, including a provisional-revision-on-emergency route and marking of changes.

Chapter 3 (p7–15) is the Distribution System Planning Code: load data and forecasts, power system studies and network expansion planning, system adequacy and redundancy, security standards, standardisation of nomenclature, substation layouts and transformer design, BIL/BSL, reactive compensation and harmonics, metering, Demand Side Management, database management and consumer indexing, and energy audit. Chapter 4 (p15–17) gives the connectivity conditions — interface points for generators, EHT/HT and low-voltage consumers, operational labelling, system performance and insulation co-ordination, application procedure and connection agreements. Chapter 5 (p17–21) is the Operation Code: demand estimation, outage planning, contingency and crisis management, demand management and load shedding, interface with generating units including CPPs, voltage and power factor control, harmonic/DC-injection/flicker limits, safety co-ordination including Permit to Work, and operational communication.

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Technical standards, Electrical safety

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document