KERC · Karnataka Electricity Regulatory Commission
Green Energy Open Access (First Amendment) Regulations, 2023 — Draft
Karnataka Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access(GEOA)) (First Amendment) Regulations, 2023
Draft amendmentDated 21 Nov 2023KERC-1-CON-2022-23/P2/1322/888 dated 21.11.2023
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment issued by the Karnataka Electricity Regulatory Commission on 21.11.2023 (p1) proposing a single change to its Green Energy Open Access Regulations, 2022, which were published in the State Gazette on 19.01.2023 (p1).
The preamble sets out s.42(4) of the Electricity Act, 2003, under which consumers taking supply from someone other than the distribution licensee are liable for an additional surcharge, and notes that the proviso to Regulation 11(v) of the 2022 Regulations exempts green energy open access consumers from that surcharge where the licensee's full fixed charges are recovered through retail supply tariff (p1).
The Commission proposes to amend that proviso so that the test becomes recovery of the licensee's full fixed costs rather than fixed charges (p1–2). The draft is notified under s.181(3); objections and suggestions may be filed with the Secretary within 30 days of publication in the official gazette (p1–2).
The draft amendment clause gives the short title, provides that the regulations come into force from the date of publication in the Official Gazette of Karnataka, and confines application to open access for electricity from renewable energy sources using intra-state transmission and/or distribution systems, including such systems incidental to inter-state transmission (p2). A two-column table reproduces the existing proviso against the proposed wording (p2).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.