Terms and Conditions for Green Energy Open Access (First Amendment) Regulations, 2024 — Draft

Karnataka Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access (GEOA) (First Amendment) Regulations, 2024

Draft amendmentDated 17 Dec 2024KERC-1-CON-2023-24/F-18/1197 dated 17.12.2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission has published a draft First Amendment to its 2022 Green Energy Open Access (GEOA) Regulations, under notification dated 17.12.2024 (p1). The draft is notified for objections and suggestions, which must be filed within 30 days of publication in the Karnataka Official Gazette; the Commission will take the draft into consideration after the same 30-day period (p3). It will come into force on Gazette publication, though the Gazette date is not printed (p3).

The preamble sets out the reasons for each change (pp1-3): align the consumer definition with the Commission's Order of 09.08.2023 allowing consumers with contracted demand or sanctioned load of 100 kW or more, through a single connection or multiple connections in the same division, to use GEOA; add short-term open access following the Order of 05.09.2024; adopt the Forum of Regulators (FoR) methodology for transmission charges after the High Court of Karnataka's Orders of 13.02.2024 in writ petitions challenging the existing levy; include other fees and charges introduced by the MoP's amendment Rules; adopt the FoR common methodology for additional surcharge; disallow adjustment of off-peak banked energy into peak slots; and reflect the waiver of 15-minute time-differentiated metering for LT open access consumers.

The operative draft (p3) gives the short title, commencement and scope - open access to renewable-energy electricity using intra-state transmission and/or distribution systems in Karnataka, including systems incidental to inter-state transmission. The comparative table (pp4-10) then sets out proposed changes to Regulations 1(d) (consumer definition), 8(ii) (application routing and short-term/medium-term/long-term open access), 11 (open access charges: transmission charges for inter-state and intra-state use, short-term GEOA formula, losses, a new clause for other fees and charges, cross-subsidy surcharge and additional surcharge), 12 (banking: monthly banking, peak TOD treatment, banking charges and computation) and 15(2) (metering). Annexures (pp11-12) provide data forms for estimating additional surcharge.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗