HERC · Haryana Electricity Regulatory Commission
Green Energy Open Access Regulations, 2023
Haryana Electricity Regulatory Commission (Green Energy Open Access) Regulations, 2023
RegulationDated 24 Apr 2023Published in the Gazette 2 May 2023HERC/59/2023 dated The 24th April, 2023
1 amendment to it is on Voltaic, dated 25 Feb 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The HERC (Green Energy Open Access) Regulations, 2023, notified as Regulation No. HERC/59/2023 on 24 April 2023 and published in the Haryana Government Gazette on 2 May 2023, create a dedicated open-access route in Haryana for electricity from green energy sources, including non-fossil-fuel waste-to-energy. They come into force on gazette publication and extend to the whole state (p1).
Chapter 1 sets the frame: it defines green energy, banking, standby charges, obligated entity and other terms, and provides that conditions not expressly covered here are governed by the Commission's 2019 solar/wind forecasting and DSM regulations, the 2012 connectivity and open access regulations and the 2021 RE tariff/RPO/REC regulations (p1–3).
Chapter 2 governs grant of open access. Consumers with contracted demand or sanctioned load of 100 kW and above are eligible, and captive consumers face no limit on power supplied. It requires a minimum of twelve 15-minute time blocks a day at unchanged quantum, allows group applications by consumers on an independent feeder, addresses consumers not on independent feeders, bars insolvent or bankrupt applicants and those with dues or theft cases, caps drawal at sanctioned contract demand, and binds consumers to the CERC IEGC 2010 and the State Grid Code (p3–4). SLDC Haryana is nodal agency for short-term open access and the STU for medium- and long-term; applications run through the Central Nodal Agency's single-window portal. The State Nodal Agency must prepare a detailed procedure within 30 days for Commission approval, decide applications within 30 days (deemed approval otherwise, first-in-first-out), and give reasons and a hearing before refusal; appeals lie to the Commission, which must decide within three months. Curtailment ranks non-green open access ahead of green (p4–5).
Chapter 3 sets banking for RE captive plants on a billing-cycle basis, with charges in kind, a ceiling on banked energy relative to monthly consumption, no carry-forward, no drawal during peak ToD hours, a settlement order of priority, and SLDC keeping the accounts; the licensee must frame a banking procedure and model agreement within 30 days (p5).
Chapter 4 lists the charges payable — transmission, wheeling, cross-subsidy surcharge, standby, banking, reactive energy, application/SLDC fees, scheduling and deviation settlement — cross-refers their methodology to the MYT Regulations 2019 and the DSM regulations, and provides limits and exemptions for cross-subsidy and additional surcharge, transmission and wheeling loss determination, and collection through the State Nodal Agency (p6–7). Chapter 5 gives yearly green certificates and the Commission's powers to relax, direct, amend, remove difficulties and savings (p7).
Read with this
Amendments and corrections
- Dated 25 Feb 2025Green Energy Open Access Regulations, 2023 — 1st Amendment, 2025
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.