Haryana Electricity Regulatory Commission (Green Energy Open Access) Regulations, 2023, 1st Amendment Regulations, 2025

AmendmentDated 25 Feb 2025Published in the Gazette 4 Mar 2025HERC/59/2023/1st Amendment/2025 dated The 25th February, 2025

Amends the Green Energy Open Access Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment by the Haryana Electricity Regulatory Commission to its Green Energy Open Access Regulations, 2023, notified 25 February 2025 and published in the Haryana Government Gazette on 4 March 2025 as Regulation No. HERC/59/2023/1st Amendment/2025 (p1).

Clause 1 supplies the short title, commencement, extent and scope. It brings the amendment into force on the date of gazette publication and extends it to the whole of Haryana. It restates what green energy open access covers — connectivity and open access for electricity from green energy sources, expressly including non-fossil-fuel waste-to-energy, using the intra-state transmission or distribution system, alone or in conjunction with the inter-state system, overriding other regulations in force. It makes existing or applied-for connectivity to the intra-state network a precondition for long-, medium- or short-term open access, permits connectivity and open access to be applied for simultaneously, and refers matters not expressly covered to three existing HERC regulations on forecasting/scheduling/deviation, connectivity and open access, and renewable tariff/RPO/REC (p1–2).

Clause 2 substitutes the first paragraph of Regulation 4 of the Principal Regulations, restating the eligibility test for green energy open access and removing any supply limit for captive consumers, and substitutes the fourth proviso to Regulation 4 dealing with eligible consumers who are not on independent feeders (p2).

Clause 3 substitutes the fifth proviso to Regulation 8(2), carving offshore wind supply to open access consumers out of additional surcharge (p2). The amendment is signed by the Secretary, HERC, and states the regulations were made after previous publication (p1–2).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges

Read with this

The regulation

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document