Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Terms and Conditions of Tariff Determination, Small Hydropower Generation Regulation, 2007

JSERC (Terms and Conditions of tariff determination, Small Hydropower Generation) Regulation, 2007

RegulationDated 3 Jul 2007Published in the Gazette 3 Jul 2007No-200 dated The 3rd July, 2007

Replaced by Small Hydro Power Projects Tariff Regulations, 2016

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Jharkhand State Electricity Regulatory Commission issued this regulation under s.61 of the Electricity Act, 2003 to fix how it will determine generation tariff for small hydropower stations in the state (p1). It is a short, self-contained principal regulation — six regulations plus a norms table — not an amendment.

Regulation 1 gives the title, extends the regulation to the whole of Jharkhand and brings it into force on publication in the Official Gazette; the Gazette Extraordinary carrying it is dated 3 July 2007 (p1). Regulation 2 defines the working vocabulary the rest of the text relies on — auxiliary energy consumption, beneficiary, CUF, COD, installed capacity, maximum available capacity, O&M expenses, project, small hydropower plant and financial year (p1–2).

Regulation 3 fixes scope: it applies where the Commission is to determine tariff for small hydro stations of installed capacity between 1 to 25 MW located in Jharkhand, but the Commission must adopt a tariff already discovered through transparent competitive bidding under s.63 (p2).

Regulation 4 sets the method: tariff rests on a benchmarked capital cost and CUF to be notified by the Commission from time to time, together with the operational and financial norms tabulated on p3. Until benchmarks are notified, tariff is determined case by case against those same norms. Regulation 5 prescribes the computation — a single-part energy charge only, derived from annual fixed charges divided by annual saleable energy, with the five components of annual fixed charges listed (p3). Regulation 6 covers case-by-case recovery of interconnection facility cost, a savings clause preserving the Commission's general powers under the Act, and powers to remove difficulties and to relax or vary any provision (p3–4).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Renewable energy tariff

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document