Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Amendment Practice Directions to Proceeding No. 05/2015 — Practice Directions No. 01/2016, 2016

Amendment Practice Directions to Proceeding No. APERC/05/2015 Dt: 29-01-2015

OrderDated 5 Feb 2016In force from 15 Feb 2016APERC/01/2016 dated 05-02-2016

Made under the Conduct of Business Regulations, 1999.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-part instrument issued by the Andhra Pradesh Electricity Regulatory Commission: a short reasoned preamble and an operative set of amendments to the Commission's earlier Practice Directions on metering (APERC/05/2015 dated 29-01-2015). It is signed on 5 February 2016 and takes effect on 15 February 2016 (p3).

The preamble (p1–2) reproduces the CEA Regulations 2006 definitions of 'Availability Based Tariff (ABT)' and 'Interface Meter', and reasons that an Interface Meter is strictly required only where both open access and ABT apply. The Commission records that in Andhra Pradesh ABT and Unscheduled Interchange charges do not apply to intra-state open access transactions, and that only consumers taking inter-state open access or power-exchange power are subject to ABT (p1). It then notes that the Transmission Licensee and Discoms have been insisting on Main, Check and Standby Interface Meters at points of interconnection for all open access consumers in the State, and issues the directions to remove that difficulty (p2).

Operatively, the amendment narrows the applicability clause of the 2015 directions so that they bind only open access users who are covered under ABT and permitted open access by the Commission, alongside generating companies and licensees (p2). It tightens the corresponding bracketed wording under the 'Location of Interface Meters' clause, substitutes the paragraph on the location of the standby meter, and deletes the following paragraph (p2). Finally it prescribes classes of accuracy for consumer meters by voltage level, requires all interface meters to be of a single accuracy class, and states the accuracy relationship between meters and their connecting current and voltage transformers (p2–3).

Standard name
Conduct of Business Regulations
Primary topics
Metering, Open access

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document