APERC · Andhra Pradesh Electricity Regulatory Commission

Metering Issues — Practice Directions No. 05/2015

Metering issues – Location, Ownership, Cost Recovery Mechanism and Responsibilities of Licensees/Generating Companies

OrderDated 29 Jan 2015In force from 15 Feb 2015Practice Directions No. APERC/05/2015 dated 29-01-2015

Made under the Conduct of Business Regulations, 1999.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a set of practice directions issued by APERC to settle day-to-day metering problems that arose while licensees and generating companies were implementing the CEA metering regulations and the CERC open access regulations (p1). It is directed at generating companies, transmission and distribution licensees, and open access users in Andhra Pradesh who fall under Availability Based Tariff and have been permitted open access (p2).

The document is built as extracts-then-analysis-then-directive. Para 4 quotes the CEA ownership clause and concludes that the supplier — the licensee or generating company from whose system electricity flows — owns and maintains interface meters (p2–3). Para 5 quotes the CERC open access provisions on intra-State entities and Special Energy Meters to fix who procures and pays for meters for open access users, and sets timelines for cost communication, installation and meter testing, with an alternative meter-rent route (p3–4). Para 6 addresses testing responsibility, requiring licensees to obtain NABL accreditation for their laboratories and permitting recovery of testing cost only when a consumer asks for testing in its own interest (p4–5).

Paras 7 to 9 fix meter locations: main, check and standby meters for generating stations (p5); locations of main, check and standby meters for open access consumers, together with an accuracy-class table by voltage level for consumer meters and a class for all interface meters (p5–6); and locations for dedicated-feeders, where the Commission records that clause 2(f) and clause 7(3) of Regulation No.4 of 2013 are inconsistent with the tariff order and GTCS and decides to delete them, with amendments to follow (p6–7). Paras 10 to 12 deal with reading of interface meters on a common date, joint sealing by supplier and buyer, and optional installation of Special Energy Meters for 1 MW and above HT services on cost-bearing by the consumer (p7–8). It comes into force from 15-02-2015 (p8), and parts were later amended by Practice Directions APERC/01/2016 dated 05-02-2016 (p2, p5, p6).

Standard name
Metering Regulations, Duty to Supply on Request
Primary topics
Metering, Open access

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (2)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document