APERC · Andhra Pradesh Electricity Regulatory Commission
Metering Issues — Practice Directions No. 05/2015
Metering issues – Location, Ownership, Cost Recovery Mechanism and Responsibilities of Licensees/Generating Companies
OrderDated 29 Jan 2015In force from 15 Feb 2015Practice Directions No. APERC/05/2015 dated 29-01-2015
Made under the Conduct of Business Regulations, 1999.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a set of practice directions issued by APERC to settle day-to-day metering problems that arose while licensees and generating companies were implementing the CEA metering regulations and the CERC open access regulations (p1). It is directed at generating companies, transmission and distribution licensees, and open access users in Andhra Pradesh who fall under Availability Based Tariff and have been permitted open access (p2).
The document is built as extracts-then-analysis-then-directive. Para 4 quotes the CEA ownership clause and concludes that the supplier — the licensee or generating company from whose system electricity flows — owns and maintains interface meters (p2–3). Para 5 quotes the CERC open access provisions on intra-State entities and Special Energy Meters to fix who procures and pays for meters for open access users, and sets timelines for cost communication, installation and meter testing, with an alternative meter-rent route (p3–4). Para 6 addresses testing responsibility, requiring licensees to obtain NABL accreditation for their laboratories and permitting recovery of testing cost only when a consumer asks for testing in its own interest (p4–5).
Paras 7 to 9 fix meter locations: main, check and standby meters for generating stations (p5); locations of main, check and standby meters for open access consumers, together with an accuracy-class table by voltage level for consumer meters and a class for all interface meters (p5–6); and locations for dedicated-feeders, where the Commission records that clause 2(f) and clause 7(3) of Regulation No.4 of 2013 are inconsistent with the tariff order and GTCS and decides to delete them, with amendments to follow (p6–7). Paras 10 to 12 deal with reading of interface meters on a common date, joint sealing by supplier and buyer, and optional installation of Special Energy Meters for 1 MW and above HT services on cost-bearing by the consumer (p7–8). It comes into force from 15-02-2015 (p8), and parts were later amended by Practice Directions APERC/01/2016 dated 05-02-2016 (p2, p5, p6).
Read with this
The regulation
- Dated 5 Jul 1999Conduct of Business Regulations, 1999
Amendments and corrections
- Published in the Gazette 11 Sep 2000Conduct of Business Regulations, 1999 — First Amendment, 2000
- Dated 23 Jun 2003Fuel Surcharge Adjustment — Conduct of Business Regulations, 1999 — Amendment Regulation 1 of 2003
- Dated 23 Jun 2003Conduct of Business Regulations, 1999 — Amendment Regulation 1 of 2003
- Dated 19 Jun 2013Conduct of Business Regulations, 1999 — Third Amendment Regulation, 2013
- Dated 7 Dec 2019Conduct of Business Regulations, 1999 — Fourth Amendment, 2019
- Dated 31 Dec 2019Conduct of Business Fifth Amendment Regulation, 2019
- Dated 8 Dec 2021Conduct of Business Regulations, 1999 — Sixth Amendment, 2021
- Dated 14 Dec 2021Corrigendum
- Dated 21 Jun 2022Conduct of Business Regulations, 1999 — Seventh Amendment, 2022
- Dated 11 Oct 2023Conduct of Business Regulations, 1999 — Eighth Amendment, 2023
- Dated 11 Oct 2023Conduct of Business Regulations, 1999 — Eighth Amendment, 2023
Procedures and orders made under it
Consolidated copies, for reference (1)
- Dated 31 Dec 2025Conduct of Business Regulations, 1999 — Consolidated
Other copies of these documents (2)
- Dated 7 Dec 2019Conduct of Business Fourth Amendment Regulation, 2019
- Dated 31 Dec 2019Conduct of Business Regulations, 1999 — Fifth Amendment Regulation, 2019
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.