Summary
Summary written by software. Check the regulator's original before you rely on it.
This is an MSERC notification — gazetted in the Meghalaya Gazette Extraordinary of 16 April 2021 and dated 15 April 2021 — issuing Guidelines that tell Meghalaya's distribution licensees how to test whether a demand side management (DSM) programme is worth doing before putting it to the Commission (p1). They are made under Regulation 6.1(c) of the MSERC (Demand Side Management) Regulations, 2016, and bind distribution licensees when formulating DSM programmes, prioritising them in the DSM plan, and preparing an individual programme document (p1–2). They take effect from publication and stay in force until the Commission modifies them (p2).
Paras 2–3 define terms and set basic principles: DSM programmes and plans go to the Commission for approval, supported by technical studies and cost-benefit analysis that also feed the ARR (p2–3). Para 4 sorts every programme into one of five categories according to who bears its cost — the licensee, consumers, both, or a government/funding agency in various combinations (p3–4). Para 5 separates programme costs from general costs and tabulates cost categories C1–C8 (p4–5).
Paras 6–8 are the analytical core: they identify the two perspectives (licensee and consumer), set the Cost Effectiveness Index and cost-of-conserved-energy criteria, and prescribe five standard cost-effectiveness tests — TRC, RIM and LRIRIM as the primary tests applied in sequence, with participant and societal tests submitted alongside (p5–16). Para 8.4 fixes default inputs (avoided cost of power purchase, discount rates, escalation rates) that the Commission may revise (p15–16). Para 9 ties approval criteria to who bears the cost and caps general costs at 10% of the total DSM budget (p16–17). The Commission may relax provisions by order and may amend the Guidelines at any time (p18).
Read with this
The regulation
- Dated 5 Jan 2016Demand Side Management Regulations, 2015
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.