MSERC · Meghalaya State Electricity Regulatory Commission
Demand Side Management Regulations, 2015
Meghalaya State Electricity Regulatory Commission (Demand Side Management) Regulations, 2015
RegulationDated 5 Jan 2016MSERC/DSM/2015/04 dated 05th January 2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the MSERC principal regulation that puts a demand-side management (DSM) framework on the state's distribution licensee — from planning and baseline research through programme approval, delivery, verification, reporting and incentives. It was notified on 5 January 2016 under s.181(2)(zp) of the Electricity Act 2003 and takes effect from publication in the Meghalaya Gazette, a date the text does not print (p2).
Chapter I names the regulations, confines their application to the Distribution Licensee in its areas of supply in Meghalaya, and defines the working vocabulary — DSM itself, baseline data, cost effectiveness index, DSM resource acquisition, ESCO, and evaluation, measurement and verification (pp2–3). Chapter II makes the Commission the setter of DSM objectives and targets and the issuer of process guidelines, and requires the licensee to assess technical potential for DSM a year before each MYT control period and to follow Bureau of Energy Efficiency methodology (pp3–5). Chapter III requires a DSM Cell within one month of notification, with defined responsibilities (p5).
Chapter IV is the operating core: load and market research and baseline development; a perspective DSM Plan with annual rolling plans filed with the tariff petition; filing at least six months before the next MYT period; separate Programme Documents for each programme, each needing prior Commission approval and cost-benefit analysis; cost-recovery routes and eligibility conditions; monitoring and reporting; and third-party EM&V (pp5–9). Chapters V–VII cover progress reporting every twelve months, programme completion reports, possible incentives for meeting targets, and standard miscellaneous powers — removal of difficulties, directions, inherent powers, amendment and interpretation (pp9–10).
Read with this
Procedures and orders made under it
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.