Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Formats for Resource Adequacy Regulations

OrderDate not stated

Made under the Framework for Resource Adequacy Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is the formats annexure to MPERC's Resource Adequacy Regulations — a set of thirteen blank tables that a Madhya Pradesh licensee must fill in to show how much power the State will need and where it will come from, rolled forward ten years.

Format-1 (p1) is the demand baseline: energy sales split by retail consumer category (LT, HT, HV, irrigation, railway traction, EV charging, metro rail, bulk residential and so on), with distribution and transmission losses at DISCOM, State and inter-State boundaries, plus DISCOM and State peak load. Format-2 (p2–3) breaks the State's ex-bus requirement into monthly figures for each of the East, West and Central DISCOMs, and separately for the SEZ, open access consumers and Railways. Format-3 (p4) projects energy availability against that requirement, source by source — MP Genco thermal and hydel, ISP/OSP/SSP and other hydel, central sector, DVC, UMPP and IPPs, wind, solar, other generators, banking and power market — down to a surplus/deficit in MU and percent. Format-4 (p5) does the same for peak demand and peak availability in MW, split between peak and off-peak hours.

Format-6 (p7) and Format-7 (p8) are the supply-side build-out schedules: project-wise capacity, scheduled commissioning date and State share, with year-wise capacity addition and monthly energy availability. Format-11 (p13) is the obligation trajectory — wind RPO, hydro RPO, the residual other RPO, total RPO, the energy storage obligation, and the additional capacity each implies. Formats-12 (p14) and Format-13 (p15) are the back-look tables, requiring actuals to be compared against what was approved as per plan, with the deviation and the reasons for it.

Between Format-7 and Format-11) are missing, and page 11 contains only the word "Continued…".

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Renewable purchase obligation (RPO / RCO), Energy storage obligation

Read with this

The regulation

2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document