Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2024

Madhya Pradesh Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024 [RG 19 (III) of 2024]

RegulationDated 5 Mar 2024No. 616/MPERC/2024 dated 5th March 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's Framework for Resource Adequacy Regulations, 2024 (Notification 616/MPERC/2024, Bhopal, 5 March 2024) create a planning-to-monitoring cycle under which MP Power Management Company Limited (MPPMCL), acting for the three state DISCOMs, must demonstrate that enough firm generation and contracted capacity is tied up to serve forecast demand at a prescribed reliability standard. The Regulations extend to the whole of Madhya Pradesh (p1) and commence on a date the Commission is to notify separately (Regulation 1.3, p1).

Chapter 1 (pp1–5) sets the objective, scope and definitions; applicability runs to generating companies, distribution licensees, SLDC, transmission companies and other grid-connected entities. Chapter 2 (p5) frames the four-step RA cycle — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — on a 10-year annual rolling basis, with LT-, MT- and ST-DRAPs to be prepared by MPPMCL.

Chapter 3 (pp5–9) specifies how demand and energy forecasts are built: CEA-aligned long/medium-term forecasts, permitted methodologies (trend, end-use, ARIMA, AI/ANN, econometric), scenario analysis, category-wise adjustment and the annual aggregation and submission calendar. Chapter 4 (pp9–16) is the analytical core: capacity crediting of resources via a net-load-based methodology for RE, separate approaches for hydro and thermal, assessment of the Planning Reserve Margin against LOLP and NENS reliability indices, identification of the resource gap, allocation of each DISCOM's share in national peak, and the content, validation and approval route for LT-DRAP and ST-DRAP. Chapter 5 (pp16–19) governs procurement planning — optimal resource mix, procurement tenure, capacity sharing, prior Commission approval of PPAs/PSAs, and additional procurement routes including emergency short-term buying.

Chapters 6 to 8 (pp19–24) set monitoring and non-compliance consequences, data-sharing duties and the annual timeline table, website disclosure, mandatory planning and real-time cells, consultation duties, and the Commission's powers to issue practice directions, relax provisions, remove difficulties and amend. Regulation 28.4 repeals the MPERC (Power Purchase and Procurement Process) Regulations, 2023 from the same separately notified commencement date (p24). Annexure-I (pp25–27) gives the modelling constraints for the resource adequacy plan, Annexure-II (p28) lists formats 1–13, and Annexure-III (p28) gives the firm-capacity equation by resource type.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document