MERC · Maharashtra Electricity Regulatory Commission
Draft Deviation, Settlement Mechanism and Related Matters Regulations, 2018 — Explanatory Memorandum
EXPLANATORY MEMORENDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DEVIATION, SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018
Explanatory memorandum to a draftReleased with the notice dated 23 Oct 2018
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Deviation Settlement Mechanism and related matters Regulations, 2018 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC's October 2018 explanatory memorandum for the draft MERC (Deviation, Settlement Mechanism and Related Matters) Regulations, 2018. It is a rationale-and-design document, not the draft Regulations themselves: it explains why MERC proposes to review the State's FBSM and introduce a frequency-linked intra-State deviation settlement mechanism, and it sets out the choices for stakeholder consultation (p1, p7–8).
Chapter 1 traces the State's FBSM/WASMP history, SLDC's Case No. 56 of 2012, MSPC's 2015 concept paper, GEPL's Case No. 181 of 2014, and the 2018 wind/solar forecasting and scheduling Regulations, which are to remain a separate regime (p4–7). Chapter 2 situates the proposal in national practice: CERC's UI/ABT and 2014 DSM Regulations, the FOR Technical Committee and SAMAST report, the FOR Model DSM Regulations, the A.S. Bakshi Expert Group, the draft CERC Fourth Amendment of 2018, and other market and ancillary-service developments (p8–17).
Chapter 3 is the substantive design section: objective, scope and applicability; pre-conditions and State-entity identification; merit-order operation; day-ahead and real-time scheduling; deviation principles and volume limits; zero crossing; infirm and start-up power; price vector and additional charges; accounting, the non-zero-sum State pool, fund use, State Energy Account, payment and letter-of-credit security; MSPC governance; and gaming (p18–42). Chapter 4 sets out transition preparedness for SLDC, metering, communication, software and pilot runs, with phased implementation targeted by April 2020 (p43–46). Chapter 5 summarises the roadmap and next steps, including keeping the State price vector aligned with future CERC revisions and having MSLDC develop codes and procedures after notification (p47).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the notice dated 23 Oct 2018Deviation Settlement Mechanism and related matters Regulations, 2018 — Draft
- Dated 23 Oct 2018Public notice: Draft Deviation Settlement Mechanism Regulations, 2018 — Public Notice
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.